Casper, WY
Casper Plumbing Permit Cost
Casper prices plumbing permits from the combined valuation table:
$60.00 for $1-$500 of valuation, +$10.00 per $1,000 band through $100,000, then $1,090.00 plus $5.60 per additional $1,000 or fraction — with a $40.00 flat permit for a tank-style water heater replacement.
How this fee is calculated
These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.
| Component | Formula | Applies when | Range |
|---|---|---|---|
| Valuation $2,001-$100,000 ($150.00 first $2,000 + $10.00 per additional $1,000 or fraction)Permit fee | $150.00 + $10.00 per $1,000 of project valuation above $2,000, or fraction thereof | Project valuation over $2,000 and up to $100,000 | — |
| Valuation over $100,000 ($1,090.00 first $100,000 + $5.60 per additional $1,000 or fraction)Permit fee | $1,090.00 + $5.60 per $1,000 of project valuation above $100,000, or fraction thereof | Project valuation over $100,000 and over $100,000 | — |
| Valuation $501-$1,000 ($65.00)Permit fee | $65.00 + $0.00 per $1,000 of project valuation above $500 | Project valuation over $500 and up to $1,000 | — |
| Valuation $1,001-$2,000 ($70.00 first $1,000 + $5.00 per additional $100 or fraction)Permit fee | $65.00 + $5.00 per $1,000 of project valuation above $1,000, or fraction thereof | Project valuation over $1,000 and up to $2,000 | — |
| Valuation $1-$500 ($60.00)Permit fee | $0.00 per $1,000 of project valuation | Project valuation up to $500 | — |
| Residential furnace replacement permit ($40.00)Permit fee | $40.00 flat fee | furnace replacement is true | — |
| Residential tank-style water heater replacement permit ($40.00)Permit fee | $40.00 flat fee | water heater replacement is true | — |
| Multi-family, commercial and industrial plan check fee (35% of the permit fee, valuation over $25,000)Plan review | 35% of calculated permit fee | Occupancy is not residential and Project valuation over $25,000 | — |
| Residential plan check fee (25% of the building permit fee, valuation over $25,000)Plan review | 25% of calculated permit fee | Occupancy is residential and Project valuation over $25,000 | — |
| Residential solar plan check fee ($50.00)Plan review | $50.00 flat fee | Occupancy is residential and solar is true | — |
A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.
A worked example
Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.
Worked example
A Casper plumber permits a residential repipe valued at $30,000.
| Input | Value |
|---|---|
| Project valuation | $30,000 |
| Occupancy class | Residential |
| Type of work | Alteration |
Example total
$537.50
An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.
Fee schedule as of 2026-09-28Rules applied 2Rules considered 10
| Component | How it is calculated | Amount |
|---|---|---|
Valuation $2,001-$100,000 ($150.00 first $2,000 + $10.00 per additional $1,000 or fraction)Permit feeCombined schedule: from $2,001 the ladder rises $10.00 per $1,000 band or fraction, printing $1,090.00 at the $100,000 seam ($150.00 + 94 × $10.00).Show the working
| $150.00 + $10.00 per $1,000 of project valuation above $2,000, or fraction thereof, in $1,000 steps | $430.00 |
Residential plan check fee (25% of the building permit fee, valuation over $25,000)Plan reviewCombined schedule: a plan check fee of 25% of the building permit fee is assessed on all residential building permits whose valuations exceed $25,000.00.Show the working
| 25% of calculated permit fee | $107.50 |
| Total | $537.50 |
Fees that do not apply here
Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.
- Valuation over $100,000 ($1,090.00 first $100,000 + $5.60 per additional $1,000 or fraction) — This fee does not apply to the inputs provided.
- Valuation $501-$1,000 ($65.00) — This fee does not apply to the inputs provided.
- Valuation $1,001-$2,000 ($70.00 first $1,000 + $5.00 per additional $100 or fraction) — This fee does not apply to the inputs provided.
- Valuation $1-$500 ($60.00) — This fee does not apply to the inputs provided.
- Residential furnace replacement permit ($40.00) — This fee does not apply to the inputs provided.
- Residential tank-style water heater replacement permit ($40.00) — This fee does not apply to the inputs provided.
- Multi-family, commercial and industrial plan check fee (35% of the permit fee, valuation over $25,000) — This fee does not apply to the inputs provided.
- Residential solar plan check fee ($50.00) — This fee does not apply to the inputs provided.
Assumptions
- Calculated from 2 fee rules in effect on 2026-09-28.
- Amounts are rounded to the nearest cent, once, at the end of each component.
Band $2,001-$100,000: $150.00 for the first $2,000 + ($30,000 − $2,000) ÷ $1,000 = 28 steps × $10.00 = $280.00. Permit = $430.00. Total: $430.00.
What is different in Casper
Plumbing work files with the Building Inspection Division under the combined Community Development schedule — the same valuation table as building, electrical and mechanical, driven by the scope's materials-and-labor value. Water heater and furnace replacements carry their $40 flat rows instead of the ladder. Sewer and water connection permits price at $35 initially. Re-inspections are $75 once an inspection has failed more than twice.
What this figure does not include
Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.
Not included in these figures
This estimate covers the plumbing permit only. It excludes:
- City of Casper water and sewer connection charges beyond the $35 permit rows.
- Plan check at 25%/35% over $25,000 valuation.
- Backflow and cross-connection program fees.
- Contractor licensing.
- Re-inspections beyond two ($75 each).
Common questions
How is a plumbing permit fee calculated in Casper?
From the plumbing scope's valuation on the combined Community Development table — $60 to $500, then $10.00 per $1,000 band to $100,000, and $1,090.00 plus $5.60 per $1,000 or fraction above, with all materials and labor counted.
Casper Community Development Building Permit Fee Schedule (2026 edition)
What would a $30,000 repipe cost to permit in Casper?
$150.00 for the first $2,000 plus 28 × $10.00 = $280.00, so $430.00 for the permit; residential plan check at 25% would add $107.50 since the valuation exceeds $25,000.
Casper Community Development Building Permit Fee Schedule (2026 edition)
How much is a water heater replacement permit in Casper?
$40.00 flat for a residential tank-style water heater replacement permit; a residential furnace replacement permit is also $40.00.
Casper Community Development Building Permit Fee Schedule (2026 edition)
What do sewer and water connection permits cost in Casper?
$35.00 for the initial sewer permit and $35.00 for the initial water permit, per the combined schedule's additional permit rows.
Casper Community Development Building Permit Fee Schedule (2026 edition)
Does Casper require plan review for plumbing work?
When valuation exceeds $25,000, the plan check is 25% of the permit fee on residential projects and 35% on multi-family, commercial and industrial projects.
Casper Community Development Building Permit Fee Schedule (2026 edition)
What are Casper's plumbing inspection fees?
Re-inspections are $75.00 each once an inspection fails more than twice; permit and code research bills at $50.00 per hour.
Casper Community Development Building Permit Fee Schedule (2026 edition)
Source and verification
The documents behind every figure on this page, with the dates that make them checkable.
- Fee schedule (PDF)CityPrimary source
One valuation table serves all four permit types: $60/$65 opening rows, +$5 per $100 band from $1,001 to $2,000, +$10 per $1,000 band to $100,000 ($1,090.00 at the seam), then the printed tail $1,090.00 + $5.60 per $1,000 or fraction. Plan check 25% residential / 35% multi-family-commercial-industrial over $25,000; $50 residential solar plan check; after-the-fact permits double, capped at $750. The casperwy.gov server 403s non-browser agents; the handout was captured from the City's Title 15 ordinance packet copy and both editions in the packet were reconciled (the superseded edition was rejected).
Verification
Last verified against the official source in Sep 2026.