Wyoming

Casper, WY permit fees and requirements

Casper's Community Development Department — Building Inspection Division prices building

electrical, plumbing and mechanical permits from one combined valuation table, dated September 11, 2026: $60.00 for $1-$500, $65.00 to $1,000, $5.00 per $100 band through $2,000, $10.00 per $1,000 band to $100,000, and the printed tail of $1,090.00 plus $5.60 per $1,000 or fraction above. Plan check adds 25% of the permit fee on residential projects and 35% on multi-family, commercial and industrial projects once valuation passes $25,000 — and because the schedule's header prices all four permit types from the same table, an electrical or plumbing job costs the same ladder as a building permit of equal value.

Verified Sep 2026

Permit costs we have worked out

Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.

Estimate your potential Casper permit fee with our Building Permit Fee Calculator.

Permit pages for Casper
PermitCategoryLast reviewed
Casper Building Permit Coststructural2026-09-26
Casper Electrical Permit Costelectrical2026-09-26
Casper Plumbing Permit Costplumbing2026-09-26

Local context

What is specific to Casper

The Building Inspection Division, at 200 North David Street, issues permits under the combined Community Development fee schedule — one table whose header names Building, Plumbing, Mechanical and Electrical together. Permits run 180 days once issued, renewing at $60 or 10% of the original fee, whichever is higher. Flat rows cover the common replacements: $40 for a tank-style water heater or furnace swap, $70 for a mobile home set, $200/$300 for residential/commercial demolition. After-the-fact permits double the fee, capped at $750, and re-inspections beyond the second cost $75 each.

Two provenance facts a careful reader should know. First, casperwy.gov returns 403 to automated readers, so the current schedule was captured from the City's own Title 15 ordinance packet — the packet contains TWO editions, and the superseded one (topping at $841, 65% plan check) was explicitly rejected in favor of the September 11, 2026 edition modelled here. Second, Casper is updating Title 15 of its municipal code to adopt the current I-codes, with the fee schedule changes riding the same ordinance (contact: Chief Building Official Justin Scott) — so this ladder's figures are recent and their legal instrument is in active transition.

Valuation

How valuation is determined here

Project valuation — all materials and labor associated with the permit type — as stated on the application; the same combined table prices all four trade and building permits.

Who to contact

The office that issues the permit, with the details we have verified. Confirm current hours before travelling.

Building Inspection Division

Phone
(307) 235-8254
Hours
Monday – Friday; permit line (307) 235-8264

Official website

What these fees do not include

The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.

Not included in our estimates

These municipal figures cover the permit fee and, over $25,000 valuation, the plan check. They exclude:

  • Erosion control permits and bonds ($50 per acre where applicable).
  • Sewer and water permit connection charges ($35 initial permit rows).
  • Planning and engineering review fees (plats, zone changes, site plans).
  • Contractor licensing fees and state licensing.
  • Re-inspections beyond the second ($75 each).
  • Code compliance inspections requested without a permit ($75 residential / $150 commercial) and permit/code research ($50/hour).

Official sources for this jurisdiction

The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.

  • Fee schedule (PDF)CityPrimary source

    City of Casper — Community Development Building Permit Fee Schedule (combined Building, Electrical, Plumbing and Mechanical), 2026 edition

    City of Casper Community Development Department · Document dated September 11, 2026 · Effective September 11, 2026 · Retrieved September 26, 2026

    One valuation table serves all four permit types: $60/$65 opening rows, +$5 per $100 band from $1,001 to $2,000, +$10 per $1,000 band to $100,000 ($1,090.00 at the seam), then the printed tail $1,090.00 + $5.60 per $1,000 or fraction. Plan check 25% residential / 35% multi-family-commercial-industrial over $25,000; $50 residential solar plan check; after-the-fact permits double, capped at $750. The casperwy.gov server 403s non-browser agents; the handout was captured from the City's Title 15 ordinance packet copy and both editions in the packet were reconciled (the superseded edition was rejected).