Casper, WY

Casper Building Permit Cost

Casper prices building permits from the combined Community Development valuation table:

$60.00 for $1-$500, $65.00 to $1,000, +$5.00 per $100 band to $2,000, +$10.00 per $1,000 band to $100,000, then the printed tail — $1,090.00 plus $5.60 per additional $1,000 or fraction. Plan check adds 25% of the permit fee residential / 35% multi-family and commercial over $25,000 valuation.

Official fee scheduleVerified Sep 2026City of Casper — Community Development Department, Building Inspection Division

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for a building permit
ComponentFormulaApplies whenRange
Valuation $2,001-$100,000 ($150.00 first $2,000 + $10.00 per additional $1,000 or fraction)Permit fee$150.00 + $10.00 per $1,000 of project valuation above $2,000, or fraction thereofProject valuation over $2,000 and up to $100,000—
Valuation over $100,000 ($1,090.00 first $100,000 + $5.60 per additional $1,000 or fraction)Permit fee$1,090.00 + $5.60 per $1,000 of project valuation above $100,000, or fraction thereofProject valuation over $100,000 and over $100,000—
Valuation $501-$1,000 ($65.00)Permit fee$65.00 + $0.00 per $1,000 of project valuation above $500Project valuation over $500 and up to $1,000—
Valuation $1,001-$2,000 ($70.00 first $1,000 + $5.00 per additional $100 or fraction)Permit fee$65.00 + $5.00 per $1,000 of project valuation above $1,000, or fraction thereofProject valuation over $1,000 and up to $2,000—
Valuation $1-$500 ($60.00)Permit fee$0.00 per $1,000 of project valuationProject valuation up to $500—
Commercial demolition permit ($300.00)Permit fee$300.00 flat feeWork type is demolition and Occupancy is not residential and Project valuation is not provided—
Residential demolition permit ($200.00)Permit fee$200.00 flat feeWork type is demolition and Occupancy is residential and Project valuation is not provided—
Residential furnace replacement permit ($40.00)Permit fee$40.00 flat feefurnace replacement is true—
Mobile home set permit ($70.00)Permit fee$70.00 flat feemobile home set is true—
Re-inspection fee ($75.00 per re-inspection)Inspection fee$75.00 per inspectionreinspections at least 1—
Residential tank-style water heater replacement permit ($40.00)Permit fee$40.00 flat feewater heater replacement is true—
Multi-family, commercial and industrial plan check fee (35% of the permit fee, valuation over $25,000)Plan review35% of calculated permit feeOccupancy is not residential and Project valuation over $25,000—
Residential plan check fee (25% of the building permit fee, valuation over $25,000)Plan review25% of calculated permit feeOccupancy is residential and Project valuation over $25,000—
Residential solar plan check fee ($50.00)Plan review$50.00 flat feeOccupancy is residential and solar is true—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A new single-family home in Casper with a valuation of $150,000.

Inputs used for this example
InputValue
Project valuation$150,000
Occupancy classResidential
Type of workNew construction

Example total

$1,712.50

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 2Rules considered 14

Fee components
ComponentHow it is calculatedAmount
Valuation over $100,000 ($1,090.00 first $100,000 + $5.60 per additional $1,000 or fraction)Permit feeCombined schedule, printed tail: 'For valuations exceeding $100,000.00, the building permit fee shall be $1,090.00 for the first $100,000.00, plus $5.60 for each additional $1,000.00, or fraction thereof.'
Show the working
Project valuation
$150,000
Amount above the first $100,000
$50,000
At $5.60 per $1,000
$280.00
Base charge
$1,090.00
Component total
$1,370.00
$1,090.00 + $5.60 per $1,000 of project valuation above $100,000, or fraction thereof, in $1,000 steps$1,370.00
Residential plan check fee (25% of the building permit fee, valuation over $25,000)Plan reviewCombined schedule: a plan check fee of 25% of the building permit fee is assessed on all residential building permits whose valuations exceed $25,000.00.
Show the working
Calculated permit fee
$1,370
Rate applied
25% of calculated permit fee
Component total
$342.50
25% of calculated permit fee$342.50
Total $1,712.50

Fees that do not apply here

Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.

  • Valuation $2,001-$100,000 ($150.00 first $2,000 + $10.00 per additional $1,000 or fraction) — This fee does not apply to the inputs provided.
  • Valuation $501-$1,000 ($65.00) — This fee does not apply to the inputs provided.
  • Valuation $1,001-$2,000 ($70.00 first $1,000 + $5.00 per additional $100 or fraction) — This fee does not apply to the inputs provided.
  • Valuation $1-$500 ($60.00) — This fee does not apply to the inputs provided.
  • Commercial demolition permit ($300.00) — This fee does not apply to the inputs provided.
  • Residential demolition permit ($200.00) — This fee does not apply to the inputs provided.
  • Residential furnace replacement permit ($40.00) — This fee does not apply to the inputs provided.
  • Mobile home set permit ($70.00) — This fee does not apply to the inputs provided.
  • Residential tank-style water heater replacement permit ($40.00) — This fee does not apply to the inputs provided.
  • Re-inspection fee ($75.00 per re-inspection) — This fee does not apply to the inputs provided.
  • Multi-family, commercial and industrial plan check fee (35% of the permit fee, valuation over $25,000) — This fee does not apply to the inputs provided.
  • Residential solar plan check fee ($50.00) — This fee does not apply to the inputs provided.

Assumptions

  • Calculated from 2 fee rules in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

Printed tail: $1,090.00 for the first $100,000 + ($150,000 − $100,000) ÷ $1,000 = 50 steps × $5.60 = $280.00. Permit = $1,370.00. Total: $1,370.00.

What is different in Casper

The Building Inspection Division, at 200 North David Street, issues building, electrical, plumbing and mechanical permits from one combined schedule — the valuation (all materials and labor) drives every trade. Permits run 180 days and renew at $60 or 10% of the original fee. Common replacements carry flat rows: $40 for a tank-style water heater or furnace swap, $70 for a mobile home set. After-the-fact permits double the fee, capped at $750. Demolitions run $200 residential / $300 commercial.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

This estimate covers the permit and, over $25,000 valuation, the plan check. It excludes:

  • Erosion control permits ($50/acre plus bond) where applicable.
  • Sewer and water connection permits ($35 initial rows).
  • Planning/engineering reviews (plats, zone changes, site plans $600-$2,300).
  • Contractor licensing.
  • Re-inspections beyond two ($75 each).

What you need before applying

  • Complete building permit application with valuationRequired

    Permit fees base off the Community Development fee schedule against project valuation (all materials and labor); after-the-fact applications — construction started before review and approval — are assessed at double the building permit fee, not to exceed $750.00.

  • 180-day permit validity and renewalMay be required

    Once issued, a permit is good for 180 days; permits exceeding 180 days since the last inspection renew at $60 or 10% of the original permit fee, whichever is higher.

Common questions

How is a Casper building permit fee calculated?

From project valuation on the combined Community Development table: $60 to $500; $65 to $1,000; then $5.00 per $100 band to $2,000; $10.00 per $1,000 band to $100,000; and $1,090.00 plus $5.60 per additional $1,000 or fraction above — with all materials and labor in the valuation.

Casper Community Development Building Permit Fee Schedule (2026 edition)

What does a $150,000 home permit cost in Casper?

$1,090.00 for the first $100,000 plus 50 × $5.60 = $280.00, so $1,370.00 for the permit; residential plan check at 25% would add $342.50 since the valuation exceeds $25,000.

Casper Community Development Building Permit Fee Schedule (2026 edition)

How much is plan review in Casper?

25% of the building permit fee on residential projects and 35% on multi-family, commercial and industrial projects — both applying when valuation exceeds $25,000.00. Residential solar plan check is a flat $50.00; commercial solar pays 35% of the solar permit fee.

Casper Community Development Building Permit Fee Schedule (2026 edition)

How long is a Casper permit good for?

180 days once issued. Permits exceeding 180 days since the last inspection renew at $60.00 or 10% of the original permit fee, whichever is higher.

Casper Building & Inspections; combined fee schedule

What does a water heater or furnace replacement permit cost in Casper?

$40.00 each — the schedule's flat rows for a residential tank-style water heater replacement permit and a residential furnace replacement permit.

Casper Community Development Building Permit Fee Schedule (2026 edition)

What happens if I build without a permit in Casper?

After-the-fact permits — construction initiated before submittal, review and approval of a complete application — are assessed at double the building permit fee, not to exceed $750.00.

Casper Community Development Building Permit Fee Schedule (2026 edition)

How much is a demolition permit in Casper?

$200.00 residential and $300.00 commercial, each plus an Erosion Control Permit if applicable ($50 per acre plus bond/surety).

Casper Community Development Building Permit Fee Schedule (2026 edition)

What are Casper's inspection fees?

Re-inspections are $75.00 each once an inspection fails more than twice; code compliance inspections run $75.00 residential and $150.00 commercial, and permit or code research bills at $50.00 per hour.

Casper Community Development Building Permit Fee Schedule (2026 edition)

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Fee schedule (PDF)CityPrimary source

    City of Casper — Community Development Building Permit Fee Schedule (combined Building, Electrical, Plumbing and Mechanical), 2026 edition

    City of Casper Community Development Department · Document dated September 11, 2026 · Effective September 11, 2026 · Retrieved September 26, 2026

    One valuation table serves all four permit types: $60/$65 opening rows, +$5 per $100 band from $1,001 to $2,000, +$10 per $1,000 band to $100,000 ($1,090.00 at the seam), then the printed tail $1,090.00 + $5.60 per $1,000 or fraction. Plan check 25% residential / 35% multi-family-commercial-industrial over $25,000; $50 residential solar plan check; after-the-fact permits double, capped at $750. The casperwy.gov server 403s non-browser agents; the handout was captured from the City's Title 15 ordinance packet copy and both editions in the packet were reconciled (the superseded edition was rejected).

Verification

Last verified against the official source in Sep 2026.