Oklahoma City, OK

Oklahoma City plumbing permit cost

An Oklahoma City plumbing permit is three schedules split by the sections' own scope words, under no minimum, and no valuation anywhere.

A one- or two-family dwelling's new construction (§ 60-42-6) is an $83.00 base with all fixtures already inside it, plus $28.50 for each bathroom more than one and $15.00 per water and per sewer service. Residential alterations and additions (§ 60-42-7) are an $84.00 base plus $7.00 per fixture and $25.50 per connection (2026 column). Everything the first section excludes — multifamily and commercial among them (§ 60-42-9) — is a $120.00 base plus the same $7 and $25.50 rows. Special fees (§ 60-42-10) hang off their own facts, and every permit adds the state's $0.50 OUBCC line.

Official fee scheduleVerified Sep 2026City of Oklahoma City

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for a plumbing permit
ComponentFormulaApplies whenRange
Commercial, multifamily, addition or replacement — base $120.00Permit fee$120.00 flat feeone two family is not true and Work type is one of new construction, addition, alteration, remodel, repair, replacement—
Commercial — $7.00 per fixturePermit fee$7.00 per fixtureone two family is not true and Work type is one of new construction, addition, alteration, remodel, repair, replacement—
Commercial — $25.50 per sewer service connectionPermit fee$25.50 per connectionone two family is not true and Work type is one of new construction, addition, alteration, remodel, repair, replacement—
Commercial — $25.50 per water service connectionPermit fee$25.50 per water service connectionone two family is not true and Work type is one of new construction, addition, alteration, remodel, repair, replacement—
Commercial dishwasher — $15.00Permit fee$15.00 flat feecommercial dishwasher is true—
Fire protection yard line — $100.00Permit fee$100.00 flat feefire protection yard line is true—
Commercial garbage disposal — $15.00Permit fee$15.00 flat feecommercial garbage disposal is true—
Garage grit or grease interceptor — $15.00 eachPermit fee$15.00 per pretreatment interceptorgrease interceptors over 0—
Oklahoma Uniform Building Code Commission collection fee — $0.50 per permitState surcharge$0.50 flat feeEvery permit of this type—
1–2 family alteration or addition — base $84.00Permit fee$84.00 flat feeone two family is true and Work type is one of alteration, remodel, repair, replacement, addition—
1–2 family alteration — $7.00 per appliance or fixture requiring connectionPermit fee$7.00 per fixtureone two family is true and Work type is one of alteration, remodel, repair, replacement, addition—
1–2 family alteration — $25.50 per sewer connectionPermit fee$25.50 per connectionone two family is true and Work type is one of alteration, remodel, repair, replacement, addition—
1–2 family alteration — $25.50 per water connectionPermit fee$25.50 per water service connectionone two family is true and Work type is one of alteration, remodel, repair, replacement, addition—
1–2 family new construction — base $83.00 (all fixtures integral to the structure)Permit fee$83.00 flat feeone two family is true and Work type is one of new construction, addition—
1–2 family new construction — $28.50 for each bathroom more than onePermit feethe first bathroom or kitchen is included in the permit fee, then $28.50 for each additional bathroom or kitchenone two family is true and Work type is one of new construction, addition—
1–2 family new construction — $15.00 per sewer servicePermit fee$15.00 per connectionone two family is true and Work type is one of new construction, addition—
1–2 family new construction — $15.00 per water servicePermit fee$15.00 per water service connectionone two family is true and Work type is one of new construction, addition—
Yard sprinkler system — $30.00Permit fee$30.00 flat feeyard sprinkler is true—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A new one- and two-family dwelling with three bathrooms, one water service and one sewer service.

Inputs used for this example
InputValue
Occupancy classResidential
Type of workNew construction
Number of bathrooms or kitchens3
Number of connections1
One two familyYes
Number of water service connections1

Example total

$170.50

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 5Rules considered 18

Fee components
ComponentHow it is calculatedAmount
1–2 family new construction — base $83.00 (all fixtures integral to the structure)Permit fee"Residential new construction ... $83.00" — "all fixtures integral to the structure" are inside this base (§ 60-42-6), which is why the fixture rows below exist only on the other two schedules.
Show the working
Flat fee
$83.00
$83.00 flat fee$83.00
1–2 family new construction — $28.50 for each bathroom more than onePermit fee"+ $28.50 for each bathroom more than one (or part thereof)" — the first bathroom is inside the base, every bathroom after the first counts at $28.50. custom.bathrooms is the count the rule reads.
Show the working
Number of bathrooms or kitchens
3
Included in the base charge (first 1)
1
Charged per bathroom or kitchen
2
Rate per unit
$28.50
Component total
$57.00
the first bathroom or kitchen is included in the permit fee, then $28.50 for each additional bathroom or kitchen$57.00
1–2 family new construction — $15.00 per sewer servicePermit fee"$15 per water and sewer service" (§ 60-42-6) — the sewer half, on custom.connections. A house with both laterals therefore pays the pair, $30.00.
Show the working
Number of connections
1
Rate per unit
$15.00
Component total
$15.00
$15.00 per connection$15.00
1–2 family new construction — $15.00 per water servicePermit fee"+ $15 per water and sewer service" (§ 60-42-6) — the water half of the pair, on custom.water_service_connections.
Show the working
Number of water service connections
1
Rate per unit
$15.00
Component total
$15.00
$15.00 per water service connection$15.00
Oklahoma Uniform Building Code Commission collection fee — $0.50 per permitState surcharge"Administrative Collection Fee, per permit ..... $0.50" (§ 60-42-11) — the same 59 O.S. § 1000.25 line as Titles 12 and 18. Contractor registration ($100/yr) and the outside-of-city travel fee are licensing and event rows, recorded in the research record.
Show the working
Flat fee
$0.50
$0.50 flat fee$0.50
Total $170.50

Fees that do not apply here

Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.

  • Commercial, multifamily, addition or replacement — base $120.00 — This fee does not apply to the inputs provided.
  • Commercial — $7.00 per fixture — This fee does not apply to the inputs provided.
  • Commercial — $25.50 per sewer service connection — This fee does not apply to the inputs provided.
  • Commercial — $25.50 per water service connection — This fee does not apply to the inputs provided.
  • Commercial dishwasher — $15.00 — This fee does not apply to the inputs provided.
  • Fire protection yard line — $100.00 — This fee does not apply to the inputs provided.
  • Commercial garbage disposal — $15.00 — This fee does not apply to the inputs provided.
  • Garage grit or grease interceptor — $15.00 each — This fee does not apply to the inputs provided.
  • 1–2 family alteration or addition — base $84.00 — This fee does not apply to the inputs provided.
  • 1–2 family alteration — $7.00 per appliance or fixture requiring connection — This fee does not apply to the inputs provided.
  • 1–2 family alteration — $25.50 per sewer connection — This fee does not apply to the inputs provided.
  • 1–2 family alteration — $25.50 per water connection — This fee does not apply to the inputs provided.
  • Yard sprinkler system — $30.00 — This fee does not apply to the inputs provided.

Assumptions

  • Calculated from 5 fee rules in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

Four lines from § 60-42-6 and the state line — $170.50.

Base: $83.00, "all fixtures integral to the structure" already inside it — which is why no fixture row appears on this schedule.

Bathrooms: "each bathroom more than one (or part thereof) — $28.50". Three bathrooms are two beyond the first: $57.00.

Services: "$15 per water and sewer service" — one water lateral and one sewer lateral, $30.00 together, priced as two counts so a sewer-only or water-only job pays only its half.

State: $0.50 OUBCC.

Total: $83.00 + $57.00 + $30.00 + $0.50 = $170.50. What moves it: one bathroom and one service would be $83 + $0.50 = $83.50; a fourth bathroom adds another $28.50 (the row counts whole bathrooms after the first, and "or part thereof" keeps a half-finished bath in the count); the same job as an alteration switches to § 60-42-7's $84 base with $7 fixture and $25.50 connection rows; and a multifamily version would price in § 60-42-9 at $120 — the exclusion is what moves it. Nothing here is floored, because Title 42 states no minimum.

What is different in Oklahoma City

The scope words do the switching: § 60-42-6's class is "one- and two-family dwellings and condominiums", § 60-42-9 excludes exactly that class — so the exclusion defines the other side, and multifamily prices at the commercial base. The rules read a single fact, custom.one_two_family, for that switch.

Nothing here reads a price of work. Bathrooms, fixtures and service connections are counts, so a plumbing total never moves because the job got more expensive: three bathrooms on a new dwelling are two chargeable bathrooms at $28.50 (the first is inside the $83 base), and a house with both a water and a sewer lateral pays the $15 pair.

The 2026 column shows on this page in one place — the alteration base is $84.00 rather than FY2025-26's $78.40 — and the state line is the same $0.50 the other two titles repeat. Title 42 states no permit minimum: the $75 floors are Title 12's and stop at the building page.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

This is Title 42's plumbing permit fee — the schedule rows for fixtures, bathrooms and service connections, the special fees the job's facts select, and the state's $0.50 line. It excludes:

  • A permit floor that does not exist here. Title 42 states no minimum; the $75 minimums are Title 12's.
  • Line extensions over ten feet. § 60-42-7 prices them at $100 each (2026 column) — a count of lines this engine has no kind for, recorded rather than flattened.
  • The washing-machine tiers, carwash and slaughterhouse traps. One machine $15, two to seven $25.50, seven to fifteen $116 — tiered on counts the row does not share with fixtures; carwash, slaughterhouse traps and building-move alteration are $28.50 rows without input triggers.
  • Event rows. Consultation $100 and after-hours inspection $175 (both 2026 column) attach to events, not to the permit calculation.
  • Contractor registration and travel. The $100/year registration and the outside-of-city travel fee are licensing and event rows.
  • The 2.7% card fee. It belongs to the payment channel.

What you need before applying

  • One- and two-family is a fact, not an occupancy labelRequired

    § 60-42-6's scope is "one- and two-family dwellings and condominiums" and § 60-42-9 excludes exactly that class — "all structures except one-and-two-family dwellings and condominiums" — so the exclusion is what defines the other side, and multifamily prices in the commercial section. The rules read custom.one_two_family for that switch, and the fixtures integral to a new dwelling are already inside its $83 base, which is why the $7 fixture row exists only on the other two schedules.

Common questions

How much is a plumbing permit in Oklahoma City?

By schedule. One-/two-family new construction: $83.00 base (fixtures included), plus $28.50 for each bathroom more than one, plus $15.00 per water and per sewer service. Residential alteration or addition: $84.00 base plus $7.00 per fixture plus $25.50 per connection. Commercial and multifamily: $120.00 base plus the same $7 and $25.50 rows. Special rows: dishwasher/garbage disposal/interceptor $15, yard sprinkler $30, fire protection yard line $100. Every permit adds $0.50 for the state.

Is the fee based on the value of the work?

No. Title 42 reads counts only — bathrooms, fixtures, water and sewer service connections — plus its flat rows. Nothing on this page changes because the job got more expensive; only the building ladder (Title 12) reads a valuation.

Does a multifamily building pay the residential rate?

No. § 60-42-6's scope is one- and two-family dwellings and condominiums, and § 60-42-9 prices "all structures except one-and-two-family dwellings and condominiums" — the exclusion is what moves multifamily to the $120 commercial base, even though the building is residential in every other sense.

Are the fixtures charged separately on a new dwelling?

No — they are inside the $83.00 base: the section says "all fixtures integral to the structure". The $7.00-per-fixture row lives on the alteration schedule (§ 60-42-7) and the commercial schedule (§ 60-42-9), where the base does not include them.

Is there a minimum on the plumbing permit?

No. Title 42 states no permit floor. The $75 minimums belong to Title 12's building ladder (§ 60-12-7 and § 60-12-9) and do not reach across titles — so a plumbing permit pays exactly its rows plus the state's $0.50.

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Municipal codeCityPrimary source

    OKC Code of Ordinances, Chapter 60 — General Schedule of Fees, Title 42 (Plumbing Code)

    City of Oklahoma City · Document dated November 18, 2025 · Effective November 18, 2025 · Retrieved September 26, 2026

    Read 2026-09-26 through the codifier. Three schedules split by scope: § 60-42-6 residential new construction for one- and two-family dwellings and condominiums (base $83 with the fixtures inside it), § 60-42-7 residential addition or replacement (2026 column base $84), § 60-42-9 for everything the first section excludes (2026 column base $120) — which is how multifamily prices — plus § 60-42-10's special fees and § 60-42-11's $0.50 OUBCC line.