Boise electrical permits price from the Electrical Code Fee Schedule:
a new single-family home pays $135-$210 per dwelling unit by square footage (plus $65 per extra 1,000 sq ft over 4,501), a single branch circuit is $55, service equipment changes are $55-$65, and commercial work pays a $14 base plus 2.28% of wiring cost over $100, stepping down to 0.57% above $10,000.
How this fee is calculated
These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.
| Component | Formula | Applies when | Range |
|---|---|---|---|
| Single branch circuit installation or alteration ($55.00)Permit fee | $55.00 flat fee | Occupancy is residential and single branch circuit is true | — |
| Commercial wiring cost $2,001-$10,000 ($84.32 + 1.14% of wiring cost over $2,000)Permit fee | 1.14% of project valuation above the first $2,000 + $84.32 | Occupancy is not residential and Project valuation is provided and Project valuation up to $100,000 | — |
| Commercial wiring cost over $10,000 ($197.18 + 0.57% of the portion over $10,000)Permit fee | 0.57% of project valuation above the first $10,000 + $197.18 | Occupancy is not residential and Project valuation is provided and Project valuation over $100,000 | — |
| Commercial wiring cost to $2,000 ($22.83 + 2.28% of wiring cost over $100)Permit fee | 2.28% of project valuation above the first $100 + $22.83 | Occupancy is not residential and Project valuation is provided and Project valuation up to $2,000 | — |
| Commercial, industrial or other permit base fee ($14.00)Permit fee | $14.00 flat fee | Occupancy is not residential and Project valuation is provided | — |
| Commercial temporary power pole ($80.00 each)Permit fee | $80.00 flat fee | temporary service is true and Occupancy is not residential | — |
| Residential elevator or dumbwaiter ($110.00, up to two inspections)Permit fee | $110.00 flat fee | elevator is true and Occupancy is residential | — |
| Hot tub or spa ($110.00, up to two inspections)Permit fee | $110.00 flat fee | hot tub is true and Occupancy is residential | — |
| Miscellaneous residential electrical work ($110.00, up to two inspections)Permit fee | $110.00 flat fee | misc electrical is true and Occupancy is residential | — |
| More than one branch circuit for an addition, alteration, repair or fixture replacement ($110.00)Permit fee | $110.00 flat fee | multi branch circuits is true and Occupancy is residential | — |
| New residential wiring, up to 2,500 sq ft per unit ($135 per dwelling unit)Permit fee | $135.00 per dwelling unit | new residential wiring is true and Dwelling units at least 1 and Project area up to 2500 | — |
| New residential wiring, 2,501-3,500 sq ft per unit ($155 per dwelling unit)Permit fee | $155.00 per dwelling unit | new residential wiring is true and Dwelling units at least 1 and Project area up to 3500 and Project area over 2500 | — |
| New residential wiring, 3,501-4,500 sq ft per unit ($175 per dwelling unit)Permit fee | $175.00 per dwelling unit | new residential wiring is true and Dwelling units at least 1 and Project area up to 4500 and Project area over 3500 | — |
| New residential wiring, 4,501 sq ft and over per unit ($210 per dwelling unit)Permit fee | $210.00 per dwelling unit | new residential wiring is true and Dwelling units at least 1 and Project area over 4500 | — |
| New residential wiring over 4,501 sq ft ($65 per additional 1,000 sq ft or portion)Permit fee | $65.00 per 1,000 sq ft of project area above 4,501 sq ft, or fraction thereof | new residential wiring is true and Project area over 4500 | — |
| Swimming pool ($165.00, up to three inspections)Permit fee | $165.00 flat fee | swimming pool is true and Occupancy is residential | — |
| Residential photovoltaic system ($110.00, up to two inspections)Permit fee | $110.00 flat fee | photovoltaic is true and Occupancy is residential | — |
| Radiant floor heating system ($110.00, up to two inspections)Permit fee | $110.00 flat fee | radiant floor is true and Occupancy is residential | — |
| Electrical reinspection fee ($55.00)Inspection fee | $55.00 per inspection | reinspections at least 1 | — |
| Residential service equipment, up to 200 amperes ($55.00)Permit fee | $55.00 flat fee | new service is true and amperage up to 200 | — |
| Residential service equipment, over 200 amperes ($65.00)Permit fee | $65.00 flat fee | new service is true and amperage over 200 | — |
| Residential temporary service ($40.00)Permit fee | $40.00 flat fee | temporary service is true | — |
A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.
A worked example
Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.
Worked example
A new 2,000-square-foot single-family home in Boise, wired complete, with a 200-amp service included in the same permit.
| Input | Value |
|---|---|
| Project area | 2,000 sq ft |
| Dwelling units | 1 |
| Occupancy class | Residential |
| Type of work | New construction |
| New residential wiring | Yes |
Example total
$135.00
An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.
Fee schedule as of 2026-09-28Rules applied 1Rules considered 22
| Component | How it is calculated | Amount |
|---|---|---|
New residential wiring, up to 2,500 sq ft per unit ($135 per dwelling unit)Permit feeElectrical Table 1-a: total square footage of structure (per unit) up to 2,500 sq. ft. — $135 per dwelling unit.Show the working
| $135.00 per dwelling unit | $135.00 |
| Total | $135.00 |
Fees that do not apply here
Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.
- Single branch circuit installation or alteration ($55.00) — This fee does not apply to the inputs provided.
- Commercial wiring cost $2,001-$10,000 ($84.32 + 1.14% of wiring cost over $2,000) — This fee does not apply to the inputs provided.
- Commercial wiring cost over $10,000 ($197.18 + 0.57% of the portion over $10,000) — This fee does not apply to the inputs provided.
- Commercial wiring cost to $2,000 ($22.83 + 2.28% of wiring cost over $100) — This fee does not apply to the inputs provided.
- Commercial, industrial or other permit base fee ($14.00) — This fee does not apply to the inputs provided.
- Commercial temporary power pole ($80.00 each) — This fee does not apply to the inputs provided.
- Residential elevator or dumbwaiter ($110.00, up to two inspections) — This fee does not apply to the inputs provided.
- Hot tub or spa ($110.00, up to two inspections) — This fee does not apply to the inputs provided.
- Miscellaneous residential electrical work ($110.00, up to two inspections) — This fee does not apply to the inputs provided.
- More than one branch circuit for an addition, alteration, repair or fixture replacement ($110.00) — This fee does not apply to the inputs provided.
- New residential wiring, 2,501-3,500 sq ft per unit ($155 per dwelling unit) — This fee does not apply to the inputs provided.
- New residential wiring, 3,501-4,500 sq ft per unit ($175 per dwelling unit) — This fee does not apply to the inputs provided.
- New residential wiring, 4,501 sq ft and over per unit ($210 per dwelling unit) — This fee does not apply to the inputs provided.
- New residential wiring over 4,501 sq ft ($65 per additional 1,000 sq ft or portion) — This fee does not apply to the inputs provided.
- Swimming pool ($165.00, up to three inspections) — This fee does not apply to the inputs provided.
- Residential photovoltaic system ($110.00, up to two inspections) — This fee does not apply to the inputs provided.
- Radiant floor heating system ($110.00, up to two inspections) — This fee does not apply to the inputs provided.
- Residential service equipment, up to 200 amperes ($55.00) — This fee does not apply to the inputs provided.
- Residential service equipment, over 200 amperes ($65.00) — This fee does not apply to the inputs provided.
- Residential temporary service ($40.00) — This fee does not apply to the inputs provided.
- Electrical reinspection fee ($55.00) — This fee does not apply to the inputs provided.
Assumptions
- Calculated from 1 fee rule in effect on 2026-09-28.
- Amounts are rounded to the nearest cent, once, at the end of each component.
Table 1-a, up to 2,500 sq ft: $135.00 per dwelling unit × 1 = $135.00. The service is inside the new-home permit's scope, so no Table 5-a row adds. Total: $135.00.
What is different in Boise
Electrical permits are issued by Planning & Development Services under the 2023 NEC. The new-home rows cover everything wired at the same time inside the structure and attached garage; pools and other exterior features permit separately at $110-$165. Standalone service-entrance and panel changes price from Table 5-a without a base fee, and a temporary service is $40. Commercial wiring cost includes all labor and material, with owner-supplied equipment counted at market value.
What this figure does not include
Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.
Not included in these figures
This estimate covers the electrical permit only. It excludes:
- Idaho Power meter, transformer and service-drop charges.
- Fire alarm permits ($175 base + $4.60 per initiating device).
- Building, plumbing and mechanical permits for the same project.
- Reinspections ($55) and after-hours inspections.
- The special investigation fee (100% of the permit fee) for work started without a permit.
What you need before applying
- Separate permits for pools and exterior featuresMay be required
Pools and other exterior features must be permitted separately using section 3 and Table 3-a of the Electrical Code Fee Schedule; standalone new electrical services price from Table 5-a.
Common questions
How much is an electrical permit for a new house in Boise?
$135 per dwelling unit up to 2,500 sq ft, $155 for 2,501-3,500 sq ft, $175 for 3,501-4,500 sq ft, and $210 plus $65 per additional 1,000 sq ft or portion over 4,501 sq ft — per dwelling unit, covering all wiring in the structure and attached garage done at the same time.
Boise City Electrical Code Fee Schedule, Table 1-a
What does a panel upgrade or service change cost to permit in Boise?
Table 5-a: $55 for service entrance equipment or panel/sub-panel/main-disconnect changes up to 200 amperes, $65 over 200 amperes, and $40 for a temporary service. No additional base fee applies.
Boise City Electrical Code Fee Schedule, Table 5-a
How are commercial electrical permits priced in Boise?
A $14 base fee plus Table 6-b on total wiring cost: $22.83 plus 2.28% of wiring cost over $100 up to $2,000; $84.32 plus 1.14% over $2,000 up to $10,000; $197.18 plus 0.57% of the portion over $10,000. Commercial temporary power poles are $80 each.
Boise City Electrical Code Fee Schedule, section 6 and Table 6-b
What counts as wiring cost for the commercial fee?
The cost to the owner of all labor, material and other costs to install the wiring system, including light fixtures and factory-installed motor control equipment. Owner-supplied equipment is included, and used material values at 50% of new retail or actual cost, whichever is greater.
Boise City Electrical Code Fee Schedule, section 6(d)-(f)
How much is a single branch circuit permit in Boise?
$55 for the installation or alteration of a single branch circuit supplying fixtures or appliances — EV outlets, water heaters, exhaust fans, ceiling fans, exterior lighting, A/C condensers, space heating and similar. No base fee is added.
Boise City Electrical Code Fee Schedule, Table 2-b
How much is a solar permit in Boise?
Residential photovoltaic systems are $110 flat (up to two inspections) under Table 3-a; the Building Code Fee Schedule's residential solar plan-review/inspection fee is $165. Commercial solar values the project at half and prices from Table 1-A.
Electrical Table 3-a; Building Code Fee Schedule items 11-12
Does Boise require a separate permit for pools and hot tubs?
Yes. Pools and other exterior features must be permitted separately using section 3 and Table 3-a: swimming pools $165 (up to three inspections), hot tubs and spas $110 (up to two inspections).
Boise City Electrical Code Fee Schedule, section 1(b) and Table 3-a
What happens on a reinspection in Boise?
The first reinspection is $55. Under the proposed FY27 schedule the second would rise to $150 and the third to $225, but the adopted schedule charges $55 per reinspection today.
Boise City Electrical Code Fee Schedule, Table 7-a
Source and verification
The documents behind every figure on this page, with the dates that make them checkable.
- Fee schedule (PDF)CityPrimary source
Boise City Electrical Code Fee Schedule (current edition, 7-17-2019)
Tables 1-a (new residential per dwelling unit by square footage: $135/$155/$175/$210 + $65 per 1,000 over 4,501), 2-b (single branch circuit $55), 3-a (other residential flat rows $110/$165), 5-a (service equipment $55/$65/$40 temporary), 6-b (commercial $14 base + $22.83 + 2.28% over $100 / $84.32 + 1.14% over $2,000 / $197.18 + 0.57% over $10,000).
Verification