Boise, ID

Boise Building Permit Cost

A Boise building permit prices from total valuation on Table 1-A of the Building Code Fee Schedule:

$26.37 for the first $500 plus $2.95 per additional $100 through $2,000, then $12.71, $9.30, $6.35 and finally $5.17 per additional $1,000 or fraction above $100,000. Plan review adds 65% of the permit fee for commercial work and 20% for one- and two-family homes.

Official fee scheduleVerified Sep 2026City of Boise — Planning & Development Services, Building Division

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for a building permit
ComponentFormulaApplies whenRange
Valuation $50,001-$100,000 ($595.30 first $50,000 + $6.35 per additional $1,000 or fraction)Permit fee$595.30 + $6.35 per $1,000 of project valuation above $50,000, or fraction thereofProject valuation over $50,000 and up to $100,000—
Valuation $100,001 and up ($913.09 first $100,000 + $5.17 per additional $1,000 or fraction)Permit fee$913.09 + $5.17 per $1,000 of project valuation above $100,000, or fraction thereofProject valuation over $100,000 and over $100,000—
Valuation $2,001-$25,000 ($70.76 first $2,000 + $12.71 per additional $1,000 or fraction)Permit fee$70.76 + $12.71 per $1,000 of project valuation above $2,000, or fraction thereofProject valuation over $2,000 and up to $25,000—
Valuation $1-$2,000 ($26.37 first $500 + $2.95 per additional $100 or fraction)Permit fee$26.37 + $2.95 per $1,000 of project valuation above $500, or fraction thereofProject valuation up to $2,000—
Valuation $25,001-$50,000 ($362.80 first $25,000 + $9.30 per additional $1,000 or fraction)Permit fee$362.80 + $9.30 per $1,000 of project valuation above $25,000, or fraction thereofProject valuation over $25,000 and up to $50,000—
Reinspection fee ($55.00)Inspection fee$55.00 per inspectionreinspections at least 1—
Commercial plan review (65% of the building permit fee)Plan review65% of calculated permit feeProject valuation is provided and Occupancy is not residential—
Residential plan review (20% of the building permit fee)Plan review20% of calculated permit feeProject valuation is provided and Occupancy is residential—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A new single-family home in Boise with a total valuation of $300,000.

Inputs used for this example
InputValue
Project valuation$300,000
Occupancy classResidential
Type of workNew construction

Example total

$2,336.51

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 2Rules considered 8

Fee components
ComponentHow it is calculatedAmount
Valuation $100,001 and up ($913.09 first $100,000 + $5.17 per additional $1,000 or fraction)Permit feeTable 1-A: $913.09 for the first $100,000.00 plus $5.17 for each additional $1,000.00 or fraction thereof.
Show the working
Project valuation
$300,000
Amount above the first $100,000
$200,000
At $5.17 per $1,000
$1,034.00
Base charge
$913.09
Component total
$1,947.09
$913.09 + $5.17 per $1,000 of project valuation above $100,000, or fraction thereof, in $1,000 steps$1,947.09
Residential plan review (20% of the building permit fee)Plan reviewOther fees, item 9: residential plan review fees for one- and two-family dwellings, townhouses, and their accessory structures will be charged at 20% of the building permit fee.
Show the working
Calculated permit fee
$1,947
Rate applied
20% of calculated permit fee
Component total
$389.42
20% of calculated permit fee$389.42
Total $2,336.51

Fees that do not apply here

Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.

  • Valuation $50,001-$100,000 ($595.30 first $50,000 + $6.35 per additional $1,000 or fraction) — This fee does not apply to the inputs provided.
  • Valuation $2,001-$25,000 ($70.76 first $2,000 + $12.71 per additional $1,000 or fraction) — This fee does not apply to the inputs provided.
  • Valuation $1-$2,000 ($26.37 first $500 + $2.95 per additional $100 or fraction) — This fee does not apply to the inputs provided.
  • Valuation $25,001-$50,000 ($362.80 first $25,000 + $9.30 per additional $1,000 or fraction) — This fee does not apply to the inputs provided.
  • Reinspection fee ($55.00) — This fee does not apply to the inputs provided.
  • Commercial plan review (65% of the building permit fee) — This fee does not apply to the inputs provided.

Assumptions

  • Calculated from 2 fee rules in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

Table 1-A top band: $913.09 for the first $100,000 + ($300,000 − $100,000) ÷ $1,000 = 200 steps × $5.17 = $1,034.00. Permit = $1,947.09. Residential plan review at 20% adds $389.42. Total: $2,336.51.

What is different in Boise

The Building Division, at 150 N Capitol Blvd, reviews and issues permits under the 2023 fee schedule. The ladder chains exactly at every seam — $70.76 at $2,000, $362.80 at $25,000, $595.30 at $50,000 and $913.09 at $100,000 are each the previous band's own product. Affordable housing owned or financed by the city pays nothing, and privately built affordable projects can apply for deferral. Work started without a permit adds a special investigation fee equal to 100% of the permit fee.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

This estimate covers the building permit and its plan review. It excludes:

  • Impact fees (police, parks, fire, ACHD).
  • Fire sprinkler and fire alarm permits ($175 + per-head/device fees).
  • Grading and erosion control (Appendix J tables).
  • Energy Code Inspection ($55) and after-hours inspections ($83/hour, two-hour minimum).
  • Utility connection and street fees.

What you need before applying

  • Construction documents for plan reviewRequired

    Permit applications go in with construction documents for plan review; additional plan review after the third review or after permit issuance is billed hourly (residential $55/hour, commercial/multi-family/fire $65/hour, one-hour minimum).

  • Special investigation for work before the permitMay be required

    A fee equivalent to 100% of the building permit fee is charged in addition to the original permit fee to investigate work commencing before a building permit is issued.

Common questions

How is a Boise building permit fee calculated?

From total valuation on Table 1-A: $26.37 for the first $500 plus $2.95 per additional $100 or fraction to $2,000; $70.76 for the first $2,000 plus $12.71 per $1,000 to $25,000; $362.80 to $50,000 at $9.30; $595.30 to $100,000 at $6.35; then $913.09 plus $5.17 per $1,000 or fraction above $100,000.

Boise City Building Code Fee Schedule, Table 1-A (eff. 10-1-2023)

How much is plan review in Boise?

Commercial building plan review is 65% of the building permit fee (item 8). Residential plan review for one- and two-family dwellings, townhouses and their accessory structures is 20% of the permit fee (item 9). Additional reviews after the third round bill at $55/hour residential and $65/hour commercial.

Boise City Building Code Fee Schedule, items 8-9 and 6

What does a permit cost for a $300,000 home in Boise?

The top band applies: $913.09 for the first $100,000 plus 200 × $5.17 = $1,034.00, so the permit alone is $1,947.09; with 20% residential plan review the total reaches $2,336.51.

Boise City Building Code Fee Schedule, Table 1-A and item 9

Is there a minimum or maximum permit fee in Boise?

Table 1-A has no stated minimum or maximum — the first band's $26.37 is the smallest charge a valuation can produce. Fire sprinkler and alarm permits cap at $4,000, but the building ladder itself is unbounded above.

Boise City Building Code Fee Schedule, Table 1-A

Does Boise offer fee waivers for affordable housing?

Yes. Affordable housing developments owned or financed by the City of Boise are not subject to building permit, plan review, or grading & drainage fees; privately owned affordable developments may apply for a deferral or exemption, evaluated case by case.

Boise City Building Code Fee Schedule, Deferrals and Exemptions

What happens if I build without a permit in Boise?

A special investigation fee equivalent to 100% of the building permit fee is charged in addition to the original permit fee, to investigate and document work that commenced before the permit was issued.

Boise City Building Code Fee Schedule, item 5

How much is a reinspection in Boise?

$55 per reinspection on all four schedules. Inspections for which no fee is specifically indicated bill at $55 per hour with a one-hour minimum, and after-hours inspections run $83 per hour with a two-hour minimum.

Boise City Building Code Fee Schedule, items 1-3

How does Boise charge for solar?

Residential solar photovoltaic systems pay a flat $165 plan-review/inspection permit fee. Commercial solar reduces the total project valuation in half and then calculates the permit and plan review fees from Table 1-A.

Boise City Building Code Fee Schedule, items 11-12

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Fee schedule (PDF)CityPrimary source

    Boise City Building Code Fee Schedule (effective October 1, 2023)

    City of Boise, Planning & Development Services · Document dated October 1, 2023 · Effective October 1, 2023 · Retrieved September 26, 2026

    Table 1-A building permit fee schedule on total valuation (five bands, $26.37 first $500 + $2.95/$100 through $913.09 first $100,000 + $5.17/$1,000), commercial plan review 65% (item 8), residential 1-2 family plan review 20% (item 9), reinspection $55, solar PV $165 flat. Text-layer PDF read with pdftotext. The FY27 proposed redline (10-1-26) shows Table 1-A unchanged.

Verification

Last verified against the official source in Sep 2026.