City of Huntington Inspections & Permits Division
- Phone
- (304) 696-5540 ext. 2003
- Hours
- Monday – Friday, 8:00 a.m. – 4:30 p.m. ET
West Virginia
Huntington's Inspections & Permits Division
in Room 100 of City Hall at 800 Fifth Avenue, issues building, electrical and plumbing permits and performs all three inspections. Its only published fee schedule is the IBC 2000 §108.2 valuation ladder, which prices total project cost (labour and materials) and adds a $20.00 application fee to every permit. The ladder charges nothing to $499, a flat $20.00 to $1,100, then rises in printed bands: $32.50 plus $6.00 per $1,000 to $25,000, $4.50 per $1,000 to $44,000, four printed bands to $50,000, $283.00 plus $3.00 per $1,000 to $100,000, and $433.00 plus $2.50 per $1,000 and each part thereof above that. A $60,000 project pays $333.00 in all.
Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.
Estimate your potential Huntington permit fee with our Building Permit Fee Calculator.
| Permit | Category | Last reviewed |
|---|---|---|
| Huntington Building Permit Cost | structural | 2026-09-27 |
| Huntington Electrical Permit Cost | electrical | 2026-09-27 |
| Huntington Plumbing Permit Cost | plumbing | 2026-09-27 |
Local context
Huntington is the seat of Cabell County on the Ohio River, and the division that permits it is small enough to publish one schedule for everything it does: its page names three inspectors — building, electrical and plumbing — and its fee document says the schedule covers 'each plan examination, building permit, and inspection'. That single instrument has been in place long enough that it still cites the International Building Code 2000's §108.2 even though the City now enforces the 2018 IBC.
The practical consequence is that electrical and plumbing work is priced on the same project-cost ladder as the building permit, because the division publishes no trade-specific table. The pages say so, and a reader who needs a figure the division quotes at the counter can call it.
Valuation
Every permit is computed from total project cost — labour and materials — as the fee page's own sentence states. The printed ladder is $1,000 wide from $2,001 upward, with the closing note 'each part thereof' above $100,000, so a partial thousand pays the whole step in that band.
The office that issues the permit, with the details we have verified. Confirm current hours before travelling.
The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.
Not included in our estimates
These figures cover City of Huntington permit fees only. They exclude:
The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.
City of Huntington — Building Permit
States the codes in force (IBC 2018, IPC 2018, NEC 2020, NFPA 1 21st ed.), that 'Building Permit Fee is determined by the cost of labor and materials for the project', and the $20.00 application fee per building permit.
City of Huntington — Building Permit Fee Schedule (IBC 2000 §108.2 valuation ladder)
Undated. Header: 'The fee schedule is outlined in Section 108.2 of the International Building Code 2000 and requires a fee for each plan examination, building permit, and inspection ... The permit fee is calculated based on the total project cost (labor and materials). An additional $20 application fee is required per building permit.' Text layer present; the ~100 printed rows reproduce the segmented ladder in fee-rules.ts to the cent. Dated here at the read date because the document prints none.
City of Huntington — Inspections & Permits Division
Names the division, its address (Room 100, City Hall), its contact details and its three inspectors — building, electrical and plumbing — which is the basis for treating the division's single published schedule as the schedule for all three trades.