Richmond's Bureau of Permits and Inspections — Department of Planning & Development Review
at 900 East Broad Street — prices building and trade permits alike on the value of work from one two-page fee schedule effective 07/01/2024: $63.00 for the first $2,000 plus $6.07 per $1,000 or fraction thereof for one- and two-family residential, $131.00 plus $8.50 per $1,000 or fraction for commercial — with a 2% Virginia state surcharge added to every permit's final calculated fee, per the schedule's own NOTE.
Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.
Estimate your potential Richmond permit fee with our Building Permit Fee Calculator.
| Permit | Category | Last reviewed |
|---|---|---|
| Richmond Building Permit Cost | structural | 2026-09-26 |
| Richmond Electrical Permit Cost | electrical | 2026-09-26 |
| Richmond Plumbing Permit Cost | plumbing | 2026-09-26 |
Local context
Richmond enforces the 2021 Virginia Uniform Statewide Building Code, including the Virginia Residential Code for one- and two-family dwellings, through the Department of Planning & Development Review at 900 East Broad Street (Room 108). A Richmond building permit covers only the building and structural portion of a project — electrical, mechanical and plumbing work files under separate trade permits, each reviewed for code compliance when submitted and priced by the same value-of-work formulas: the schedule's opening sentence lists electrical and plumbing among the permits 'calculated as follows'.
Two features make Richmond's schedule distinctive. The value of work is not taken from the applicant alone: it is the higher of the contractor's estimate or the RS Means valuation, so understating a bid only moves the fee to the City's number. And the schedule prices withdrawn or rejected applications at 5% of the initial permit fee (minimum $25) with plan-review minimums at 10%, so abandoning a submittal is not free.
Both formulas print 'or fraction thereof', so the value of work rounds up to the whole $1,000 above the $2,000 threshold — a $12,300 residential job pays $63 + $6.07 × 11 = $129.77 before the surcharge. Other schedule rows a project may touch: demolition at $184 residential / $368 commercial (plus $.01/sq ft above 10,000 sq ft, capped at $1,000), certificates of occupancy at $263, re-inspections at $32/$63, and after-hours inspections at $110/hour.
Valuation
Value of work equals the higher of either the contractor estimate or the RS Means price, per the fee schedule's own NOTE.
The office that issues the permit, with the details we have verified. Confirm current hours before travelling.
The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.
Not included in our estimates
These municipal figures cover the permit fee and the state surcharge. They exclude:
The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.
City of Richmond Fee Schedule (effective 07/01/2024)
Residential 1 & 2 family: $63.00 for the first $2,000 plus $6.07 per $1,000 or fraction thereof. Commercial: $131.00 plus $8.50 per $1,000 or fraction. A 2.0% state surcharge is added to the final calculated fee of every permit. Value of work equals the higher of the contractor estimate or RS Means price.
Permits and Inspections — Department of Planning & Development Review
Confirms the trade-permit split: a building permit covers only the building and structural portion; electrical, mechanical and plumbing work files under separate trade permits reviewed when submitted.
Residential Building Plan Review Requirements (links the fee schedule)
States that Richmond permit fees are based on provided construction costs and square footage, and names the fee schedule URL used as this seed's primary source.