Vermont

Burlington, VT permit fees and requirements

Burlington prices building permits from the estimated cost of construction at $8.50 per $1,000 with a $30.00 minimum (BCO Chapter 8-28(a))

plus a $15.00 recording fee — the City's own example prices a $50,000 deck at $440.00.

Verified Sep 2026

Permit costs we have worked out

Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.

Estimate your potential Burlington permit fee with our Building Permit Fee Calculator.

Permit pages for Burlington
PermitCategoryLast reviewed
Burlington building permit feesstructural2026-09-26
Burlington electrical permit feeselectrical2026-09-26
Burlington plumbing permit feesplumbing2026-09-26

Local context

What is specific to Burlington

Burlington's building fee is one of the simplest in the dataset: a single linear rate written into the Code of Ordinances. Chapter 8-28(a) prices building permit fees from the estimated cost of construction — design, labor and materials — at $8.50 per $1,000.00, with a $30.00 minimum. The City's Permit Fees page shows the arithmetic twice: a $1,500 deck carries the $30.00 minimum, and a $50,000 deck carries $440.00 — $8.50 × 50 = $425.00 plus the $15.00 recording fee the page adds to every construction permit.

Permitting runs through two divisions at 645 Pine Street. The Zoning Division issues the land-use permit first — zoning approval 'always comes first,' and zoning fees ($122 on the small-deck example, $475 in two halves on the large one) are separate from the construction permit. The Building & Trades Division (802-863-9094) then issues the Building, Electrical, Plumbing and Mechanical permits, which can all be applied for together in the City's OpenGov portal.

Vermont's statewide plumbing rules apply in Burlington 'without exception,' and state-licensed master plumbers and electricians pull their own trade permits. The City publishes no stand-alone trade fee schedule online — trade fees are set at application by the Trades Division — so this dataset prices the building permit the ordinance fixes and documents the trade process.

Valuation

How valuation is determined here

Estimated cost of construction — design, labor and materials — at $8.50 per $1,000, $30.00 minimum, plus the $15.00 recording fee. Partial thousands round up.

Who to contact

The office that issues the permit, with the details we have verified. Confirm current hours before travelling.

Department of Permitting & Inspections — Building & Trades Division

Phone
(802) 863-9094
Hours
Monday through Friday, 8:00 a.m. to 4:30 p.m.

Official website

What these fees do not include

The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.

Not included in our estimates

These figures are the BCO 8-28(a) construction permit fee. They exclude:

  • Zoning permit application fees — $122 on the City's small-deck example, $250 + $225 (in two halves) on the large one — which are separate land-use charges.
  • Electrical, plumbing and mechanical trade permit fees, which the Building & Trades Division sets at application; no stand-alone trade schedule is published online.
  • Impact fees and Certificate of Occupancy fees (an additional $10.00 where a Building COA is required).
  • The work-without-permit penalty under BCO 8-28(f).

Official sources for this jurisdiction

The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.

  • Municipal codeCityPrimary source

    Burlington Code of Ordinances Chapter 8-28(a) — building permit fees

    City of Burlington · Document dated September 26, 2026 · Effective July 1, 2020 · Retrieved September 26, 2026

    Quoted verbatim on the City's Permit Applications and Forms page: 'Building Permit Application Fees are set by Burlington Code of Ordinances (BCO) Chapter 8-28(a) Fees. Fees are based on the Estimated Cost of Construction (design/labor/material costs) at the rate of $8.50 per $1,000.00 with a minimum permit fee of thirty ($30.00) dollars.' Work-without-permit penalty at BCO 8-28(f).

  • City websiteCityPrimary source

    Construction Permits — Building & Trades Division scope

    City of Burlington Building & Trades Division · Document dated September 26, 2026 · Effective July 1, 2020 · Retrieved September 26, 2026

    'Most applications that require a zoning permit also require a Building, Electrical, Plumbing and/or Mechanical permit.' Trades Division contact 802-863-9094; all permits applied for together in the online system; zoning approval comes first.

  • City websiteCityPrimary source

    Permit Fees — City of Burlington fee examples

    City of Burlington Zoning Division · Document dated September 26, 2026 · Effective July 1, 2020 · Retrieved September 26, 2026

    COA Level I example: $30 Construction Permit Fee ('any project up to $2858 construction cost') on a $1,500 deck. COA Level II example: $440 Construction Permit Fee on a $50,000 deck — '$8.50 per $1,000 of construction cost plus $15 recording fee' ($425 + $15). Zoning fees and impact fees listed separately.

  • City websiteCityPrimary source

    Plumbing / Mechanical — state rules adoption and inspection process

    City of Burlington Building & Trades Division · Document dated September 26, 2026 · Effective July 1, 2020 · Retrieved September 26, 2026

    Burlington adopts the State of Vermont Plumbing Rules 'without exception'; Vermont master licensed plumbers must secure permits in the City; owner-occupied single-family plumbing work allowed. Underground, rough and final inspections described.