Provo prices building permits from project valuation on the 1997 UBC Table 1-A chart:
$23.50 to $500, then per-$100 and per-$1,000 rates stepping from $14.00 per $1,000 down to $3.15 per $1,000 — with plan review at 65% of the permit fee and a 1% state fee.
Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.
Estimate your potential Provo permit fee with our Building Permit Fee Calculator.
| Permit | Category | Last reviewed |
|---|---|---|
| Provo building permit fees | structural | 2026-09-26 |
| Provo electrical permit fees | electrical | 2026-09-26 |
| Provo plumbing permit fees | plumbing | 2026-09-26 |
Local context
Provo's own fee prose is short and stable: the Consolidated Fee Schedule's Inspection Fees section says the building permit is 'based on the 1997 UBC Fee Chart,' and the City's FAQ repeats the mechanism — permit cost based on construction valuation, read from a table found in the 1997 UBC, plan check at 65%, plus a 1% state fee sent to the state for training. That makes the 1997 Uniform Building Code's Table 1-A the operative chart, and its rows chain exactly: $23.50 flat to $500; $23.50 + $3.05 per $100 to $2,000 ($69.25 at the seam); $69.25 + $14.00 per $1,000 to $25,000 ($391.25); $10.10 per $1,000 to $50,000 ($643.75); $7.00 per $1,000 to $100,000 ($993.75); $5.60 per $1,000 to $500,000 ($3,233.75); $4.75 per $1,000 to $1,000,000 ($5,608.75); then $3.15 per $1,000 above.
One bundling rule matters for houses: for residential structures with not more than 4 units, the building permit fee includes the plumbing, electrical and mechanical permit fees. Stand-alone trade permits file at the printed minimums — $75.00 for electrical and plumbing inspection (Commercial Electrical $175.00), with plumbing fixtures priced $20.00 for the first and $6.00 each after.
Building Inspection sits at 351 West Center Street and runs plan review at 65% of the permit fee; valuation itself follows International Code Council Building Valuation Data, which the schedule names directly.
Valuation
Project valuation (per ICC Building Valuation Data) read against the 1997 UBC Table 1-A chart: $23.50 flat to $500, $3.05 per $100 to $2,000, $14.00 per $1,000 to $25,000, $10.10 per $1,000 to $50,000, $7.00 per $1,000 to $100,000, $5.60 per $1,000 to $500,000, $4.75 per $1,000 to $1,000,000, then $3.15 per $1,000. Each partial increment rounds up.
The office that issues the permit, with the details we have verified. Confirm current hours before travelling.
The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.
Not included in our estimates
These figures are the permit fees the City's schedule and the 1997 UBC chart print. They exclude:
The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.
1997 UBC Table 1-A Building Permit Fee Schedule (verbatim adoption)
The 1997 UBC Table 1-A ladder Provo's schedule adopts: $23.50 to $500; $23.50 + $3.05/$100 to $2,000; $69.25 + $14.00/$1,000 to $25,000; $391.25 + $10.10/$1,000 to $50,000; $643.75 + $7.00/$1,000 to $100,000; $993.75 + $5.60/$1,000 to $500,000; $3,233.75 + $4.75/$1,000 to $1,000,000; $5,608.75 + $3.15/$1,000 above. Transcribed verbatim from a municipal code adopting the table; band bases chain exactly.
The issuing office (351 West Center Street, 801-852-6410): permit applications, inspections and contractor resources.
Provo City Consolidated Fee Schedule — Inspection Fees
Read 2026-09-26 via text extraction proxy (direct fetch 403). Inspection Fees: 'Building permit — Based on the 1997 UBC Fee Chart. Building Valuation — Based upon International Code Council Building Valuation Data. Plan review — 65% of the Building Permit Fee.' Trade rows: Electrical Inspection $75, Commercial Electrical $175, Mechanical minimum $75, Commercial Mechanical $175, Plumbing minimum $75 with first fixture $20 / additional $6 / water heater $6. 'For residential structures with not more than 4 units the building permit fee includes the plumbing, electrical, and mechanical permit fees.'
provo.gov FAQ — building codes and permit cost basis
'The permit cost is based on the cost (valuation) of the construction. We use a table found in the 1997 UBC to assess the permit fees. A plan check fee of 65% of the building permit fee is charged. A state fee of 1% of the building permit fee is charged and sent to the state for training of inspectors and contractors.'