Building Services Division (Community Development Department)
- Phone
- (605) 394-4120
- Hours
- Monday – Friday, 8:00 a.m. – 5:00 p.m. MT
South Dakota
Rapid City permits are issued by Building Services under RCMC Title 15
and the amounts live in two one-page tables the division publishes — Table 100-A for residential work, Table 100-C for everything else. Both start at a $37.00 flat band ($1–$1,600) and climb eight bands to a $3,539.50 (residential) or $5,608.75 (commercial) base above $1,000,000, with every excess rounded up to whole $1,000. Plan review adds 10% of the permit fee for 1–2 family dwellings and 50% for all other occupancies. The adopted trade codes print no fee tables — § 15.04.320 delegates every amount to Common Council resolution.
Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.
Estimate your potential Rapid City permit fee with our Building Permit Fee Calculator.
| Permit | Category | Last reviewed |
|---|---|---|
| Rapid City building permit cost | structural | 2026-09-26 |
| Rapid City electrical permit cost | electrical | 2026-09-26 |
| Rapid City plumbing permit cost | plumbing | 2026-09-26 |
Local context
Rapid City is a resolution-priced city: the municipal code never prints a fee. § 15.04.320 says every fee 'shall be determined by resolution of the Common Council', and the operative resolution documents are the two Table PDFs on Building Services' fee page — published in 2016 and still linked today. Their quality control is their own chaining: every band's printed base equals the band below run to its ceiling, so a misread digit shows up immediately as a broken seam. One real seam breaks — residential band 2's $39.00 at $2,000 against band 3's $45.00 at $2,001 — and the tables print it that way.
The plan-review pair is printed identically on both tables: 10% for 1–2 family dwellings and accessory structures, 50% for everything else. On a $320,000 house that is $140.95; on a $60,000 commercial build-out it is $356.88 — plan review at half the permit fee is the sharpest percentage in this dataset.
The trades ride the building permit too. The adopted electrical (NEC), plumbing (2015 UPC), mechanical and gas chapters amend technical provisions but price nothing; a stand-alone trade-scale job on an existing building is a building-permit application priced by declared valuation on Table 100-C. Chapter 15.16's floor — permits required for fees of $10 or more — and its homeowner-permit regime are the only trade-specific fee rules in the code.
Valuation
One basis: declared construction valuation under § 15.04.170 — all construction work plus finish work, roofing, electrical, plumbing, heating, elevators and permanent equipment, excluding site improvements and parking lots. The declared figure walks Table 100-A (residential occupancy) or Table 100-C (everything else), each band's excess rounding up to whole $1,000. Plan review computes on the computed permit fee.
The office that issues the permit, with the details we have verified. Confirm current hours before travelling.
The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.
Not included in our estimates
These figures are the City's own permit amounts. They are not a project cost, and they exclude:
The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.
Read 2026-09-26 from the Internet Archive captures of the city's own URLs (Wayback 2024-11-26 and 2025-04-30) after rcgov.org's Cloudflare challenge blocked scripted retrieval; the live Building Permits Fee Information page confirms both PDFs are the tables the city publishes today. Table 100-A: eight residential bands from a $37.00 flat to $3,539.50 base above $1,000,000, plus the 10% dwelling plan-review row and $42.00/hr event rows. Table 100-C: eight commercial bands from the same $37.00 flat to $5,608.75 base above $1,000,000, plus the 50% plan-review row and $47.00/hr event rows. Printed typos ('$500,00.00', '$100,000.000') resolved by the ladders' own chaining.
Read 2026-09-26. § 15.04.320 prints no amounts: fees 'shall be determined by resolution of the Common Council', and work commenced before permit issuance pays double (emergency exception). Chapter 15.16 states the electrical permit floor ('a permit is required for fees equal to or greater than $10') and the homeowner-permit regime; Chapter 15.24 adopts the 2015 UPC; Chapter 15.28 is repealed. No trade chapter prints a fee table — the council resolution documents behind the two Table PDFs price everything, MEP work included inside the building permit's § 15.04.170 valuation definition.