Warwick, RI

Warwick electrical permit fees

An electrical permit in Warwick reads the same statewide valuation ladder as the building permit:

$10.00 per $1,000 to $10,000 of valuation, $100 + $8.00 per $1,000 to $50,000, $420 + $6.00 per $1,000 above, with the $75.00 minimum.

Official fee scheduleVerified Sep 2026City of Warwick, Rhode Island

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for an electrical permit
ComponentFormulaApplies whenRange
ELEC permit, valuation to $10,000 ($10.00 per $1,000)Permit fee$10.00 per $1,000 of project valuation, or fraction thereofProject valuation up to $10,000—
ELEC permit, $10,001-$50,000 ($100 + $8.00 per $1,000)Permit fee$100.00 + $8.00 per $1,000 of project valuation above $10,000, or fraction thereofProject valuation over $10,000 and up to $50,000—
ELEC permit, above $50,000 ($420 + $6.00 per $1,000)Permit fee$420.00 + $6.00 per $1,000 of project valuation above $50,000, or fraction thereofProject valuation over $50,000—
ELEC permit minimum fee ($75.00)Surchargethe shortfall up to the $75.00 minimum on calculated permit feepermit fee under 7500—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A stand-alone electrical scope in Warwick declared at $12,000.

Inputs used for this example
InputValue
Project valuation$12,000
Occupancy classResidential

Example total

$116.00

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 1Rules considered 4

Fee components
ComponentHow it is calculatedAmount
ELEC permit, $10,001-$50,000 ($100 + $8.00 per $1,000)Permit feeCity of Warwick schedule, middle band: $100 for the first $10,000 plus $8.00 per $1,000 exceeding $10,000, to $50,000. The printed base chains leg 1 exactly ($10.00 x 10 = $100).
Show the working
Project valuation
$12,000
Amount above the first $10,000
$2,000
At $8.00 per $1,000
$16.00
Base charge
$100.00
Component total
$116.00
$100.00 + $8.00 per $1,000 of project valuation above $10,000, or fraction thereof, in $1,000 steps$116.00
Total $116.00

Fees that do not apply here

Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.

  • ELEC permit, valuation to $10,000 ($10.00 per $1,000) — This fee does not apply to the inputs provided.
  • ELEC permit, above $50,000 ($420 + $6.00 per $1,000) — This fee does not apply to the inputs provided.
  • ELEC permit minimum fee ($75.00) — This fee does not apply to the inputs provided.

Assumptions

  • Calculated from 1 fee rule in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

Middle band: $100.00 for the first $10,000 plus $8.00 for each of the 2 thousands above: $100.00 + 2 x $8.00 = $116.00.

A $5,000 job would compute $50.00 on the first leg, and the printed $75.00 minimum would carry the fee instead.

What is different in Warwick

The statewide regulation prices municipal permit fees by valuation, and Warwick's electrical permit reads the same §21.12(A)(35) ladder the building permit does — there is no per-circuit or per-service row in the schedule. A $5,000 electrical scope prices $50.00 (the $75.00 minimum carries instead), a $10,000 scope prices $100.00, a $25,000 scope prices $260.00.

The band seams are the checkpoints: below $10,000 the $10.00 rate runs; to $50,000 the $8.00 rate rides on $100.00; above $50,000 the $6.00 rate rides on $420.00 — a rate only a whole project's electrical package would reach.

The office at 3275 Post Road issues the permit, and the regulation's statutory-levy exclusion applies to the electrical ladder like every other.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

This is the statewide schedule's electrical permit fee. It excludes:

  • The building permit for the project the electrical work belongs to.
  • The § 23-27.3-108.2(c)(1) statutory levy, excluded by the regulation's terms.
  • Fire alarm permits, which ride the fire/mechanical side rather than the electrical ladder.
  • Plan review — none is published.

Common questions

How much is an electrical permit in Warwick?

The statewide ladder: $10.00 per $1,000 to $10,000, $8.00 per $1,000 to $50,000, $6.00 above — $75.00 minimum.

Does the fee scale with the job's value?

Yes — the schedule prices by project valuation, so the declared electrical scope value drives the fee.

Is there a minimum?

Yes — $75.00, the schedule's printed note.

Who fixes the rate?

The Rhode Island Building Code Commission's regulation 510-RICR-00-00-21.

When did the current rate take effect?

The active amendment is effective December 10, 2023.

How does a $25,000 scope price?

$100.00 + 15 x $8.00 = $220.00, in the middle band.

Do I file with the city or the state?

With the City — Building Inspection & Zoning Enforcement — under the state-set fee.

Is the fee different for commercial work?

No — the ladder makes no occupancy distinction.

What about a service upgrade?

It is an electrical permit priced from its own scope value on the same ladder.

Is plan review charged?

The schedule publishes no plan-review percentage.

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Municipal codeStatePrimary source

    510-RICR-00-00-21 State Wide Permitting Fee — §21.12(A)(35) City of Warwick schedule

    Rhode Island Building Code Commission · Document dated December 10, 2023 · Effective December 10, 2023 · Retrieved September 26, 2026

    Read 2026-09-26 from the Secretary of State's regulations host (HTTP 200). ACTIVE RULE, amendment effective 2023-12-10. §21.6 requires municipalities to compute permit fees from the §21.12 schedules. Warwick (§21.12(A)(35)): $10.00 per $1,000 to $10,000; $100 + $8.00 per $1,000 exceeding $10k to $50,000; $420 + $6.00 per $1,000 exceeding $50k above; $75 minimum fee. Band bases chain exactly ($10 x 10 = $100; $100 + $8 x 40 = $420).

Verification

Last verified against the official source in Sep 2026.