Buffalo building permit cost
A Buffalo building permit is priced on one of two sheets, chosen by the building:
a detached 1- or 2-family dwelling pays a flat band for a new house ($500 to $900 by floor area, $1,000 for a two-family) or $5.00 for each $1,000 of cost on an addition, with a $50 floor — and everything else pays $8.00 for each $1,000 of mean construction cost, rounded up to a whole thousand, above a $100 minimum. Plan review rides beside it: 20% of the permit fee in a house, $0.75 per $1,000 of mean cost elsewhere.
How this fee is calculated
These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.
| Component | Formula | Applies when | Range |
|---|---|---|---|
| Building permit — commercial application fee, $50.00Other fee | $50.00 flat fee | not (one two family is true) | — |
| Building permit — residential application fee, $25.00Other fee | $25.00 flat fee | one two family is true | — |
| Building permit — communication antennas and dishes, co-location ($100)Permit fee | $100.00 flat fee | not (one two family is true) and antenna is true | — |
| Building permit — awnings (without signage) ($75)Permit fee | $75.00 flat fee | not (one two family is true) and awning is true | — |
| Building permit — commercial accessory-structure demolition, $75.00Permit fee | $75.00 flat fee | not (one two family is true) and Work type is demolition and accessory structure is true | — |
| Building permit — commercial demolition, $0.12 per sq. ft. ($500 minimum)Permit fee | $0.12 per sq ft | not (one two family is true) and Work type is demolition and not (accessory structure is true) and not (interior tear out is true) | min $500.00 |
| Building permit — commercial interior tear-out, $200.00Permit fee | $200.00 flat fee | not (one two family is true) and Work type is demolition and interior tear out is true and not (accessory structure is true) | — |
| Building permit — fence requiring a permit (over height, etc.) ($50)Permit fee | $50.00 flat fee | not (one two family is true) and fence is true | — |
| Building permit — commercial construction permit, $8.00 per $1,000 of cost ($100 minimum)Permit fee | $8.00 per $1,000 of project valuation, or fraction thereof | not (one two family is true) and not (Work type is demolition) | min $100.00 |
| Building permit — sheds & garages 600 square feet and under ($100)Permit fee | $100.00 flat fee | not (one two family is true) and shed garage is true | — |
| Building permit — sign face replacement, existing signs (except l.e.d. faces) ($25)Permit fee | $25.00 flat fee | not (one two family is true) and sign face replacement is true | — |
| Building permit — freestanding signs (under 6' in height) ($50)Permit fee | $50.00 flat fee | not (one two family is true) and sign freestanding is true | — |
| Building permit — portable signs ($25)Permit fee | $25.00 flat fee | not (one two family is true) and sign portable is true | — |
| Building permit — projecting wall signs & awning signs ($75)Permit fee | $75.00 flat fee | not (one two family is true) and sign projecting is true | — |
| Building permit — flat wall signs ($50)Permit fee | $50.00 flat fee | not (one two family is true) and sign wall is true | — |
| Building permit — storage pod, up to 4 months (with use variance approval) ($50)Permit fee | $50.00 flat fee | not (one two family is true) and storage pod is true | — |
| Building permit — tank installation or removal ($300)Permit fee | $300.00 flat fee | not (one two family is true) and tank is true | — |
| Building permit — temporary trailer (over 10 days, up to 1 year) ($200)Permit fee | $200.00 flat fee | not (one two family is true) and trailer is true | — |
| Building permit — commercial use permit, $50.00Permit fee | $50.00 flat fee | not (one two family is true) and change of use is true | — |
| Building permit — alternative energy systems ($75)Permit fee | $75.00 flat fee | one two family is true and alternative energy is true | — |
| Building permit — chimney work ($25)Permit fee | $25.00 flat fee | one two family is true and chimney is true | — |
| Building permit — residential addition, alteration or repair, $5.00 per $1,000 of cost ($50 minimum)Permit fee | $5.00 per $1,000 of project valuation | one two family is true and Work type is one of addition, alteration, repair, remodel, replacement | min $50.00 |
| Building permit — Demolition of a detached accessory structure over 144 sq. ft. ($75.00)Permit fee | $75.00 flat fee | one two family is true and Work type is demolition and accessory structure is true | — |
| Building permit — Demolition of a 1- or 2-family dwelling ($300.00)Permit fee | $300.00 flat fee | one two family is true and Work type is demolition and not (accessory structure is true) | — |
| Building permit — new or expanded parking area and/or driveway ($25)Permit fee | $25.00 flat fee | one two family is true and driveway is true | — |
| Building permit — fence requiring a permit (over height, etc.) ($25)Permit fee | $25.00 flat fee | one two family is true and fence is true | — |
| Building permit — interior tear-out ($25)Permit fee | $25.00 flat fee | one two family is true and interior tear out is true | — |
| Building permit — new one-family dwelling, 1,000 sq. ft. or less of floor area ($500.00)Permit fee | $500.00 flat fee | one two family is true and not (townhouse is true) and not (Dwelling units is 2) and Work type is new construction and Project area up to 1000 | — |
| Building permit — new one-family dwelling, 1,001 to 3,000 sq. ft. of floor area ($600.00)Permit fee | $600.00 flat fee | one two family is true and not (townhouse is true) and not (Dwelling units is 2) and Work type is new construction and Project area over 1000 and up to 3000 | — |
| Building permit — new one-family dwelling, 3,001 to 5,000 sq. ft. of floor area ($750.00)Permit fee | $750.00 flat fee | one two family is true and not (townhouse is true) and not (Dwelling units is 2) and Work type is new construction and Project area over 3000 and up to 5000 | — |
| Building permit — new one-family dwelling, 5,001 sq. ft. of floor area and over ($900.00)Permit fee | $900.00 flat fee | one two family is true and not (townhouse is true) and not (Dwelling units is 2) and Work type is new construction and Project area over 5000 | — |
| Building permit — new two-family dwelling, $1,000.00Permit fee | $1,000.00 flat fee | one two family is true and not (townhouse is true) and Dwelling units is 2 and Work type is new construction | — |
| Building permit — new townhouse, $500.00 per unitPermit fee | $500.00 per dwelling unit | one two family is true and townhouse is true and Work type is new construction | — |
| Building permit — in-ground pool, spa, pond, over two feet deep ($150)Permit fee | $150.00 flat fee | one two family is true and pool in ground is true | — |
| Building permit — aboveground pool, spa, over two feet deep ($50)Permit fee | $50.00 flat fee | one two family is true and pool overground is true | — |
| Building permit — sheds and garages (over 144 square feet and under 600 square feet) ($75)Permit fee | $75.00 flat fee | one two family is true and shed garage is true | — |
| Building permit — use permit, with change of use ($25.00)Permit fee | $25.00 flat fee | one two family is true and change of use is true | — |
| Building permit — use permit, add or remove incidental home occupation ($25.00)Permit fee | $25.00 flat fee | one two family is true and home occupation is true | — |
| Building permit — use permit, use temporary storage pod(s) for up to 4 months ($25.00)Permit fee | $25.00 flat fee | one two family is true and storage pod is true | — |
| Building permit — commercial plan review, $0.75 per $1,000 of mean cost ($75 minimum)Plan review | $0.75 per $1,000 of project valuation, or fraction thereof | not (one two family is true) and plan review is true | min $75.00 |
| Building permit — residential plan review, 20% of the permit fee ($25 minimum)Plan review | 20% of calculated permit fee | one two family is true and plan review is true | min $25.00 |
| Building permit — demolition without a permit, $1,500.00 penaltySurcharge | $1,500.00 flat fee | not (one two family is true) and Work type is demolition and unpermitted work is true | — |
A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.
A worked example
Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.
Worked example
The sheet's own Example 1: a new 16,000 sq. ft. office building, Group B, Type IIB, whose mean construction cost is $3,741,600, with plans required for review.
| Input | Value |
|---|---|
| Project valuation | $3,741,600 |
| Occupancy class | Commercial |
| Type of work | New construction |
| Plan review | Yes |
| One two family | No |
Example total
$32,792.50
An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.
Fee schedule as of 2026-09-28Rules applied 3Rules considered 42
| Component | How it is calculated | Amount |
|---|---|---|
Building permit — commercial application fee, $50.00Other feeCommercial sheet, Application Fee: "$50". The commercial counterpart of the residential sheet's $25 — and, like it, held out of the base subtotal so nothing measures a percentage against the application fee. The commercial sheet covers every job the residential sheet does not: it opens by requiring permits for all work not exempt under Charter §103-2.3, and its header keeps the trades out — "Heating, Electrical, and Plumbing (M/E/P) permits and fees are separate."Show the working
| $50.00 flat fee | $50.00 |
Building permit — commercial construction permit, $8.00 per $1,000 of cost ($100 minimum)Permit feeCommercial sheet: "Permit Fee — Use the Building Valuation Data Table (page 2) to calculate mean construction cost for new construction, additions, change of use, and alterations. For repairs and for work on elements that are not part of the building, use the contract amount instead. New construction, additions, change of use, or alterations — $8 per $1,000 of cost; $100 minimum." Both worked examples on the sheet multiply in whole $1,000s of cost ("or portion thereof"), so this rule rounds up before multiplying: $3,741,600 of mean cost is $29,936.00. Demolition has its own rows below and does not answer here.Show the working
| $8.00 per $1,000 of project valuation, or fraction thereof, in $1,000 steps | $29,936.00 |
Building permit — commercial plan review, $0.75 per $1,000 of mean cost ($75 minimum)Plan reviewCommercial sheet: "Plan Review Fee (if work requires plans) $0.75 per $1,000 of mean construction cost or portion thereof; $75 minimum. Use the Building Valuation Data Table (page 2) to determine the mean construction cost." The "or portion thereof" charges any part of a $1,000 as a whole one — the sheet's Example 1 computes $3,741,600 as $3,742,000 — so this rule rounds the cost up before multiplying. The $75 floor binds below $100,000 of mean cost.Show the working
| $0.75 per $1,000 of project valuation, or fraction thereof, in $1,000 steps | $2,806.50 |
| Total | $32,792.50 |
Fees that do not apply here
Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.
- Building permit — residential application fee, $25.00 — This fee does not apply to the inputs provided.
- Building permit — communication antennas and dishes, co-location ($100) — This fee does not apply to the inputs provided.
- Building permit — awnings (without signage) ($75) — This fee does not apply to the inputs provided.
- Building permit — commercial accessory-structure demolition, $75.00 — This fee does not apply to the inputs provided.
- Building permit — commercial demolition, $0.12 per sq. ft. ($500 minimum) — This fee does not apply to the inputs provided.
- Building permit — commercial interior tear-out, $200.00 — This fee does not apply to the inputs provided.
- Building permit — fence requiring a permit (over height, etc.) ($50) — This fee does not apply to the inputs provided.
- Building permit — sheds & garages 600 square feet and under ($100) — This fee does not apply to the inputs provided.
- Building permit — sign face replacement, existing signs (except l.e.d. faces) ($25) — This fee does not apply to the inputs provided.
- Building permit — freestanding signs (under 6' in height) ($50) — This fee does not apply to the inputs provided.
- Building permit — portable signs ($25) — This fee does not apply to the inputs provided.
- Building permit — projecting wall signs & awning signs ($75) — This fee does not apply to the inputs provided.
- Building permit — flat wall signs ($50) — This fee does not apply to the inputs provided.
- Building permit — storage pod, up to 4 months (with use variance approval) ($50) — This fee does not apply to the inputs provided.
- Building permit — tank installation or removal ($300) — This fee does not apply to the inputs provided.
- Building permit — temporary trailer (over 10 days, up to 1 year) ($200) — This fee does not apply to the inputs provided.
- Building permit — commercial use permit, $50.00 — This fee does not apply to the inputs provided.
- Building permit — alternative energy systems ($75) — This fee does not apply to the inputs provided.
- Building permit — chimney work ($25) — This fee does not apply to the inputs provided.
- Building permit — residential addition, alteration or repair, $5.00 per $1,000 of cost ($50 minimum) — This fee does not apply to the inputs provided.
- Building permit — Demolition of a detached accessory structure over 144 sq. ft. ($75.00) — This fee does not apply to the inputs provided.
- Building permit — Demolition of a 1- or 2-family dwelling ($300.00) — This fee does not apply to the inputs provided.
- Building permit — new or expanded parking area and/or driveway ($25) — This fee does not apply to the inputs provided.
- Building permit — fence requiring a permit (over height, etc.) ($25) — This fee does not apply to the inputs provided.
- Building permit — interior tear-out ($25) — This fee does not apply to the inputs provided.
- Building permit — new one-family dwelling, 1,000 sq. ft. or less of floor area ($500.00) — This fee does not apply to the inputs provided.
- Building permit — new one-family dwelling, 1,001 to 3,000 sq. ft. of floor area ($600.00) — This fee does not apply to the inputs provided.
- Building permit — new one-family dwelling, 3,001 to 5,000 sq. ft. of floor area ($750.00) — This fee does not apply to the inputs provided.
- Building permit — new one-family dwelling, 5,001 sq. ft. of floor area and over ($900.00) — This fee does not apply to the inputs provided.
- Building permit — new two-family dwelling, $1,000.00 — This fee does not apply to the inputs provided.
- Building permit — new townhouse, $500.00 per unit — This fee does not apply to the inputs provided.
- Building permit — in-ground pool, spa, pond, over two feet deep ($150) — This fee does not apply to the inputs provided.
- Building permit — aboveground pool, spa, over two feet deep ($50) — This fee does not apply to the inputs provided.
- Building permit — sheds and garages (over 144 square feet and under 600 square feet) ($75) — This fee does not apply to the inputs provided.
- Building permit — use permit, with change of use ($25.00) — This fee does not apply to the inputs provided.
- Building permit — use permit, add or remove incidental home occupation ($25.00) — This fee does not apply to the inputs provided.
- Building permit — use permit, use temporary storage pod(s) for up to 4 months ($25.00) — This fee does not apply to the inputs provided.
- Building permit — residential plan review, 20% of the permit fee ($25 minimum) — This fee does not apply to the inputs provided.
- Building permit — demolition without a permit, $1,500.00 penalty — This fee does not apply to the inputs provided.
Assumptions
- Calculated from 3 fee rules in effect on 2026-09-28.
- Amounts are rounded to the nearest cent, once, at the end of each component.
The sheet computes this on page 3, and every line here is its own. Application fee: $50.00.
Plan review is $0.75 per $1,000 of mean construction cost "or portion thereof": the $3,741,600 is charged as $3,742,000 — the sheet's own step, rounding the cost up to the next whole thousand — and 3,742 thousands at $0.75 is $2,806.50, above the $75 floor.
The permit fee is $8.00 per $1,000 of the same rounded cost: 3,742 × $8.00 is $29,936.00, above the $100 minimum.
Total: $50.00 + $2,806.50 + $29,936.00 = $32,792.50 — the figure the sheet prints. What moves it: at $945,496 of mean cost (the sheet's Example 2) the same three lines come to $8,377.50 with the $50 use permit of an occupancy change added; without plans, the plan review line disappears; and in a house the same job would be priced on the residential sheet's bands and $5-per-$1,000 row instead, where nothing rounds to a whole thousand.
What is different in Buffalo
The sheet is decided by one fact — whether the job is on a detached 1- or 2-family dwelling — because the two schedules are different documents rather than one schedule split into columns. The residential sheet has no valuation table: it bands new dwellings by floor area and prices alterations by cost, and its $5 row never prints the round-up phrase, so a fraction of a thousand is charged as the fraction it is ($12,001 of cost is $60.01) with the $50 floor binding at $10,000 and below. The commercial sheet works the other way round: it takes a mean construction cost from the ICC table, rounds the cost itself up to the next whole $1,000, and multiplies — the sheet's own Example 1 runs a $3,741,600 new building up to $3,742,000, then $2,806.50 of plan review and $29,936.00 of permit fee, and $50 of application makes $32,792.50. This site reproduces that total to the cent.
Plan review is a separate line with its own floor on each sheet — 20% of the permit fee with $25 minimum, where the percentage reads the permit fee alone so the $25 application is not part of it, and $0.75 per $1,000 with $75 minimum where the floor binds below $100,000 of mean cost. Flat fees for small work — a fence, a sign, a tank, a shed — are added beside the permit rather than folded into it, because the sheets' own totals add them: application, plan review, use permit, flat fees, then the permit fee itself.
Two charges a reader might expect are absent and their absence is documented rather than assumed: no state or county surcharge appears anywhere in the City's fee documents, and the certificate prices ($200 to $900) are charged for a certificate rather than for the permit.
What this figure does not include
Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.
Not included in these figures
This is the Buffalo building permit fee — application, plan review and permit fee under the sheet that answers the job, plus whatever flat fees the job triggers. It excludes:
- Certificate fees. The commercial sheet prices a Conditional Certificate at $200, a residential certificate at $50, and commercial certificates at $300, $600 and $900 by floor-area band. They are named here and not computed.
- The ICC mean-cost derivation. The commercial charges compute from the mean construction cost you supply; producing it from the ICC table's rate, the scope-of-work factor and the work area is the applicant's calculation (R × S × W = C), printed on page 2 of the sheet.
- Heating, electrical and plumbing work. The commercial sheet's own header: "Heating, Electrical, and Plumbing (M/E/P) permits and fees are separate." The residential sheet's plan review line says it "includes M/E/P plan review fees", so those reviews are not added again — but the trade permits themselves are separate permits priced on their own pages.
- Demolition penalties for unpermitted work on the residential sheet. The $1,500 penalty for demolishing without a permit is printed on the commercial sheet only; the residential sheet's demolition rows are $300 and $75 by unit and carry no penalty line.
- The exemptions in Charter §103-2.3. The sheet requires permits for all work not listed as exempt there; the list itself is in the Charter, which this pass could not read (the City's codifier answers 403), so an exempt project would still be priced here.
- License, rental registration and returned-check charges. Not permitting, and not charged.
- The ePermits convenience fee. Online filing notes a convenience fee on card payments — the payment channel's charge rather than the sheet's.
What you need before applying
- Permits for all work not exempt under Charter §103-2.3 — and the two sheets never overlapRequired
The commercial sheet opens with it: "Permits are required for all work that is not listed as exempted in Section 103-2.3 of the Buffalo City Charter." The fee-schedule hub adds the split from the other direction — "Building Permit fees … does not include plumbing, electrical, or heating work" — and the commercial sheet's own header keeps the trades out: "Heating, Electrical, and Plumbing (M/E/P) permits and fees are separate." Which building sheet answers is therefore one fact on this site: whether the job is on a detached 1- or 2-family dwelling.
- Plan review is charged when the work requires plans, at each sheet's own rateMay be required
Residential: "Plan Review Fee (if work requires plans) (includes M/E/P plan review fees) — 20% of permit fee; $25 minimum" — one percentage that already contains the mechanical, electrical and plumbing reviews, so those are not added again on their own pages. Commercial: "$0.75 per $1,000 of mean construction cost or portion thereof; $75 minimum", which is when plans are required as well. Both are in addition to the permit fee, and both are modelled as their own line rather than folded into the permit.
- The mean construction cost is the applicant's own lookup: R × S × W = CRequired
The commercial sheet prints the method on page 2: find the tabular rate R for the use and construction type in the ICC Building Valuation Data Table, multiply by the City's scope-of-work factor S (1 for a new building, .6 with foundation and superstructure only, .8 with the envelope, .7 for an addition or alteration, .5, .3, .3 for narrower scopes), multiply by the work area W, and the result C is the mean construction cost the $0.75 and $8 per-$1,000 charges are computed from — with multi-use buildings summed use by use. This site takes C as an input; producing it from area and occupancy is the applicant's calculation, and the pages say so rather than pretending the engine ran it.
- Online filing through ePermitsMay be required
The Department's pages offer online filing through ePermits, linked from the fee-schedule hub, and the ePermits page notes a convenience fee on card payments. That fee is the payment processor's rather than a permit fee of the sheets transcribed here, so it is named rather than charged — as the hub's stale 2014 effective-date sentence is recorded rather than followed.
Common questions
How much is a building permit in Buffalo?
It depends on the sheet. A detached 1- or 2-family dwelling pays $25 to apply, then a flat band for a new house ($500 to $900 by floor area, $1,000 for a two-family, $500 per townhouse unit) or $5.00 per $1,000 of cost for an addition, alteration or repair with a $50 minimum. Any other building pays $50 to apply, $8.00 per $1,000 of mean construction cost with a $100 minimum, and — when plans are required — $0.75 per $1,000 of plan review with a $75 minimum.
What is mean construction cost, and where does it come from?
The commercial sheet's own basis: the ICC Building Valuation Data rate for the building's use and construction type, multiplied by the City's scope-of-work factor, multiplied by the work area — R × S × W = C. The sheet prints the table and seven scope factors on page 2 and works two examples on pages 3 and 4. This site takes the resulting cost as your input; the lookup itself is the applicant's calculation.
Why does the cost round up to a whole $1,000?
Because the commercial sheet says so in two places: the plan review line reads "$0.75 per $1,000 of mean construction cost or portion thereof", and both worked examples charge $8.00 per $1,000 "or portion thereof" — rounding $3,741,600 to $3,742,000 before multiplying. The residential $5 row prints no such phrase and prorates instead, which is why $12,001 of residential cost is $60.01 rather than $60.00.
Is plan review included in the permit fee?
No — it is a separate line on both sheets, in addition to the permit fee. Residential plan review is 20% of the permit fee with a $25 minimum, taken when the work requires plans, and its percentage reads the permit fee alone: the $25 application fee is not part of the basis. Commercial plan review is $0.75 per $1,000 of mean cost with a $75 minimum. The residential line explicitly includes the M/E/P plan review fees, so the trade reviews are not charged again.
Are electrical or plumbing work included in this total?
No. The commercial sheet's header states that "Heating, Electrical, and Plumbing (M/E/P) permits and fees are separate", and the fee-schedule hub says that building permit fees do not include plumbing, electrical or heating work. Each trade has its own permit, its own schedule and its own page here — and the residential plan review line's note that it "includes M/E/P plan review fees" means only the reviews ride along, not the permits.
When is a certificate fee charged?
The commercial sheet prices certificates separately from the permit: a Conditional Certificate is $200, a residential certificate for a 1- or 2-family home is $50, and commercial certificates are $300, $600 or $900 by floor-area band. They are charged when a certificate issues rather than when a permit is taken, so they are named on this site and not added to any permit total.
Source and verification
The documents behind every figure on this page, with the dates that make them checkable.
- Fee schedule (PDF)CityPrimary source
Read 2026-09-25 as the Department's own four-page PDF, every page printed "EFFECTIVE 7/1/2025". Page 1 is the fee schedule: $50 application, $0.75 per $1,000 plan review "or portion thereof" with a $75 minimum, $8 per $1,000 permit with a $100 minimum, twelve flat fees, the demolition rows including the $1,500 no-permit penalty, the certificate prices and the use permit. Page 2 is the ICC Building Valuation Data Table (February 2023) with the City's own scope-of-work factors; pages 3 and 4 are two worked examples — $32,792.50 on a $3,741,600 new building and $8,377.50 on a $945,496 alteration — both of which this jurisdiction's tests reproduce cent for cent. The sheet opens with the Charter's exemption clause and keeps the trades out: "Heating, Electrical, and Plumbing (M/E/P) permits and fees are separate."
- Fee schedule (PDF)CityPrimary source
City of Buffalo — Building Permit Fee Schedule, Residential: Detached 1- & 2-Family Dwellings
Read 2026-09-25 as the Department's own one-page PDF, printed "EFFECTIVE 7/1/2025" at the foot of the sheet. Transcribed in full: the $25 application fee, the 20% plan review with its $25 minimum and its note that it includes M/E/P review fees, the four one-family area bands with the $1,000 two-family and $500-per-unit townhouse rows, the $5-per-$1,000 cost row with its $50 minimum, the eight flat fees, the two demolition rows and the three use permits, and the sheet's own total line. The extraction needed the PDF's content-stream coordinates: a stray "65" sits mid-page in a different font, away from every value column, and is a layout artifact of the header block rather than a fee — all real values sit at one x-coordinate, and the application fee row reads $25.
- City websiteCity
City of Buffalo — Department of Permit & Inspection Services, division pages
Read 2026-09-25, together with the Permits page (/719/Permits) and the Electrical division page (/499/Electrical). The division pages are where the trade split is operated — each trade has its own division, contact and process — and where online filing is offered through ePermits, whose page notes a convenience fee for card payments. The department contact facts on this site (address, main line, plumbing room) come from these pages and from the fee sheets' own letterheads.
- Fee schedule (PDF)City
ICC Building Valuation Data, February 2023 — the mean-cost table the commercial sheet points to
Read 2026-09-25: the mean construction rate table the commercial sheet instructs applicants to use — rate by use/occupancy and construction type, times the City's own scope-of-work factor, times the work area, equals the mean construction cost that the $0.75 and $8 per-$1,000 charges are computed from. The City republishes the ICC's February 2023 table on its own document centre. This jurisdiction takes the resulting cost as an input; the area-times-rate derivation itself is a 300-cell lookup this engine does not model as one rule, and the pages say so (reading c).
Verification
Last verified against the official source in Sep 2026.