Boulder City, NV permit fees and requirements
Boulder City prices a building permit from a bracket table of 51 published ranges — $27.00 up to $500 of valuation
$414.50 at $50,000 — plus a $40 issuance fee, and publishes the per-square-foot unit costs an applicant should use to derive that valuation when there is no contract price. Electrical and plumbing permits are four flat items and two flat items, priced by amperage, tonnage or unit count rather than by money.
Permit costs we have worked out
Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.
Estimate your potential Boulder City permit fee with our Building Permit Fee Calculator.
| Permit | Category | Last reviewed |
|---|---|---|
| Boulder City building permit cost | structural | 2026-09-24 |
| Boulder City electrical permit cost | electrical | 2026-09-24 |
| Boulder City plumbing permit cost | plumbing | 2026-09-24 |
Local context
What is specific to Boulder City
Four things about this schedule are worth knowing before you read any figure from it.
The first is that it chains to the cent, and it is worth saying so because its neighbour does not. Every bracket of the Valuation Table is a fixed amount for a $1,000 range, and the two rows that continue above $50,000 start where the bracket below left off: $414.50 is exactly what the table produces at $50,000, and $639.50 at $100,000 is exactly what the $4.50 band produces there. Two valuation tables in one state, one that chains without a seam and one with a four-and-a-half-cent seam. A schedule is a document, not a convention, and each is modelled as printed.
The second is that the schedule tells you how to value the work. "Common Unit Costs Used to Calculate Valuation" sits on the same page as the fee table: $112.65 per square foot for a wood-framed dwelling with air conditioning, $119.73 for masonry, $65.00 for a room, $44.63 for a garage, $4.00 per foot for a wood or vinyl fence. That is unusual and it is useful — it means a reader who knows square footage but has no contract price can still arrive at the City's own figure rather than guessing, and the worked example on this site's building page follows that chain end to end.
The third is the issuance fee, and it is a reading rather than a certainty. The schedule opens "Unless indicated a $40 Issuance Fee will be applied to every permit", and each trade block on the same page indicates the opposite in print: "Price Includes Issuance Fee". The Valuation Table is not a trade block and does not indicate anything, so a building permit is modelled as the table's amount plus $40 and a trade permit as its flat amount. If the City means the table to include it, every building figure here is $40 high, and the building page says so in plain words.
The fourth is what is deliberately outside these figures. Plan review is published as a deposit — "Equal to full plan review fees for the project, based on project valuation. This can be calculated using the Valuation Table on page 2" — and a deposit equal to the review fee, computed from the same table as the permit, would double every published figure if added unconditionally. Privilege tax and transportation ($1.00 per square foot commercial, $1,000 per house residential, plus a separate $1,000 per house tax), meter installation and connection fees under Resolution 6570 (water $7,450 to $74,088, sewer $1,800 to $15,000, electric $2,500 to $7,500 by amperage, then $6.25 per amp above 1,200) and the event fees — re-inspection, same-day, after-hours, overtime, expedited review — are all real, all published, and all charged by nobody on this site. Each page names them.
Valuation
How valuation is determined here
The valuation is the value of the work being permitted, including labor and materials, and it applies even when you do the work yourself. The schedule states it on the Valuation Table in capitals: "VALUATION SHALL INCLUDE LABOR & MATERIALS FOR WORK BEING PERMITTED EVEN IF WORK IS COMPLETED AS OWNER/BUILDER".
When there is a contract price, that price is the valuation. When there is not — an owner doing the work, a scope priced by the hour, a repair — the City publishes the unit costs to derive one: $112.65 per square foot for a wood-framed dwelling with air conditioning (R-3, VB), $119.73 for masonry (R-3, VA), $65.00 per square foot for a room, $50.00 for a finished basement, $15.00 unfinished, $90.00 for pool surface area, $44.63 for a garage, $20.00 for a wood or metal storage shed, $15.00 per foot for a retaining wall, $6.50 for a CMU block wall, $35.00 for a garage converted to living space.
That is a rate for computing an input, not a fee, and this site applies it as such: the building page's worked example multiplies a square foot figure by the City's own dwelling rate and then runs the result through the fee table. No cost per square foot is ever applied to a fee directly, because no such fee exists in this schedule.
Who to contact
The office that issues the permit, with the details we have verified. Confirm current hours before travelling.
What these fees do not include
The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.
Not included in our estimates
These figures are the permit fees published on the Permit Fee Schedule and Valuation Table of the City of Boulder City's Building and Safety Division, computed by this site's engine. They are not a total project cost. In particular they exclude:
- Plan review, which the schedule publishes only as a non-refundable deposit — "Equal to full plan review fees for the project, based on project valuation. This can be calculated using the Valuation Table on page 2" — plus hourly revision reviews at $45.00 per half hour and $90.00 per half hour expedited. Adding a deposit that equals the review fee to the permit fee would charge the same money twice.
- Privilege tax and transportation: $1.00 per square foot of commercial development, $1,000 per house residential (both noted as Clark County rates effective 1 July 2020), plus a separate $1,000 per house residential tax. Charged on development rather than on a permit, and charged here by nobody.
- Meter installation and connection fees under Resolution 6570 — water from $7,450 at three-quarter inch to $74,088 at two inches, sewer from $1,800 to $15,000, electric $2,500 to $7,500 by amperage and $6.25 per amp above 1,200. Real, published, and utility charges rather than permit fees.
- Inspection and event fees: re-inspection $90.00 per hour with a one-hour minimum, same-day and after-hours inspection $90.00 per hour, overtime inspection $180.00 with a two-hour minimum on Friday and Saturday, expedited plan review $90.00 per half hour.
- Mechanical (HVAC) permits, published at $75.00 for a 1-3 ton unit and $100.00 for 3.5-5 ton plus $35 and $60 for each additional unit on a permit — transcribed, not modelled in this release.
- Miscellaneous and demolition: demolition $85.00 up to 1,000 square feet and $115.00 above, moving a structure $200.00, parking a modular building $90.00 plus $50.00 per additional building.
- Anything charged by Clark County or by another city. Boulder City sits inside Clark County and issues its own permits; a county estimate does not describe them.
Official sources for this jurisdiction
The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.
- City websiteCity
Building Permit Guidelines and Forms — Building and Safety Division
The Division's own landing page and the address the schedule prints for itself. It is recorded as the authority behind the schedule rather than as a source of rates: no figure on this site is taken from it.
- Fee schedule (PDF)CityPrimary source
Permit Fee Schedule and Valuation Table — Building and Safety Division
Two pages, sha256 e7500fcdecfeff7ee972630c03a6fdd384d42fb6ebd68b431c7732a384c0a748. Page 1 carries the trade and miscellaneous fees, page 2 the Valuation Table and the unit costs. It states its own effective date: "Effective as of August 3, 2020". Both pages were read twice: the Valuation Table was mis-paired by `pdftotext -layout`, which printed the fee column one row out of step with the range column, and the `-table` read caught it — the same class of error the project's two-mode rule exists to catch.