Jackson, MS

Jackson Electrical Permit Cost

Jackson's electrical permit is a single-issue trade permit for electrical projects not attached to a larger building application — meter change-outs

adding outlets and fixtures, panel repairs, temporary electric poles. It's applied for through the City's OpenGov portal. But the City publishes no electrical permit fee schedule: the adopted schedule that Sec. 26-2 defers to is not online, and the portal's application form is visible only after sign-in. The fee is set from that schedule at review and quoted when you're notified to pay. No amount is invented here — this page documents what the permit covers and how the fee gets set.

Official fee scheduleVerified Sep 2026City of Jackson — Department of Planning and Development, Office of Code Services

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

No published fee schedule

Jackson does not publish a fee schedule we can calculate from, so this page does not show a figure. The department contact details and requirements are on the jurisdiction page.

What is different in Jackson

The permit covers single-issue work by bonded, licensed electrical contractors; larger projects include their electrical scope in the general building application instead. Applications route through intake review at the Warren Hood Building, and payment comes only after all reviews complete — by credit card or ACH online, or by cash or check at the division. Inspections are requested and monitored through the same portal, and the permit prints with job cards that must be posted on site.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

No fee estimate is offered because none is published. A final Jackson electrical permit may include the permit fee itself and any reinspection charges in the adopted schedule; Entergy's metering and connection charges, state licensing costs and any building-permit fee for a larger project sit outside this trade permit entirely.

What you need before applying

  • Bonded, licensed contractorRequired

    Permits are issued only to master technicians who are bonded contractors; any contractor performing construction work in Jackson must have a bond on file with the office as required by ordinance, and advertising as licensed without the proper City of Jackson Mechanical Board license is unlawful.

Common questions

How much does an electrical permit cost in Jackson, MS?

The City doesn't publish the amount. The adopted schedule of fees that Sec. 26-2 defers to isn't posted online, and the OpenGov application form shows fees only after sign-in. The Building Permit Division quotes the fee during review; call (601) 960-1160 for the amount. Third-party sites quoting Jackson electrical fees cite no official source.

Jackson Code of Ordinances Sec. 26-2; OpenGov portal

What work needs a stand-alone electrical permit in Jackson?

Electrical projects not associated with a Commercial or Residential Building Permit: meter change-outs, adding outlets and fixtures, panel repairs, temporary electric poles and similar single-issue jobs. If the work is part of a larger project, the general contractor or project lead includes it in the building application rather than filing separately.

City of Jackson Building Permitting portal

How do I apply for a Jackson electrical permit?

Through the City's OpenGov portal under Building Permitting. Applications must be complete or they're rejected, and permits are issued only to master technicians who are bonded contractors with a bond on file in the office.

City of Jackson Building Permitting portal

When is the electrical permit fee paid in Jackson?

After review. The portal notifies you when the permit is ready to pay; payment is online by credit card or ACH, or by cash or check at the division. The permit issues automatically once payment completes.

City of Jackson Building Permitting portal

Do I need plans for a Jackson electrical permit?

Applications must be accompanied by two complete sets of drawings unless the work is minor enough not to require plan review or is part of a permitted building project. For typical single-issue electrical work — a meter swap, a panel repair — the minor-work exception applies.

City of Jackson Building Permitting portal

Can a homeowner pull an electrical permit in Jackson?

The portal's conditions state permits are issued only to master technicians who are bonded contractors, and contractors must hold the proper City of Jackson Mechanical Board license. Homeowners planning their own electrical work should contact the Building Permit Division at (601) 960-1160 to confirm how the rule applies to them.

City of Jackson Building Permitting portal

How are electrical inspections handled in Jackson?

Through the OpenGov portal: you request and monitor inspections online as needed, and the permit prints with a job card that must be posted on site in a protective sleeve somewhere easily visible.

City of Jackson Building Permitting portal

What is a temporary electric pole permit in Jackson?

The portal lists temporary power among the examples a stand-alone electrical permit covers — service for construction sites before permanent power is connected. The fee comes from the same unpublished adopted schedule; the division quotes it at (601) 960-1160.

City of Jackson Building Permitting portal

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Permit portalCityPrimary source

    City of Jackson Building Permitting portal (OpenGov)

    City of Jackson · Undated document · Retrieved September 26, 2026

    The application channel. Lists Residential Building, Commercial Building, Demolition/Moving, Electrical, Fence, Gas, Mechanical, Plumbing, POD, generator and related permit types with their scope descriptions (quoted on the pages). Every 'Apply Online' action routes to the Viewpoint Cloud sign-in, so fees are visible only after authentication; the payment step happens after review ('you will receive notification to pay your permit fee').

  • Municipal codeCityPrimary source

    Jackson Code of Ordinances, Ch. 26 (Buildings and Building Regulations), Sec. 26-2 — Permit, fee

    City of Jackson · Document dated March 5, 2019 · Effective March 5, 2019 · Retrieved September 26, 2026

    Sec. 26-2: 'The permit fee for work requiring a permit shall be established by the adopted schedule of fees. The adopted schedule of fees shall govern.' (Ord. No. 2019-30(9), eff. 2019-03-05.) The code defers to the adopted schedule without reproducing it, and no appendix of the Municode consolidation publishes one.

Verification

Last verified against the official source in Sep 2026.