Jackson's electrical permit is a single-issue trade permit for electrical projects not attached to a larger building application — meter change-outs
adding outlets and fixtures, panel repairs, temporary electric poles. It's applied for through the City's OpenGov portal. But the City publishes no electrical permit fee schedule: the adopted schedule that Sec. 26-2 defers to is not online, and the portal's application form is visible only after sign-in. The fee is set from that schedule at review and quoted when you're notified to pay. No amount is invented here — this page documents what the permit covers and how the fee gets set.
How this fee is calculated
These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.
No published fee schedule
Jackson does not publish a fee schedule we can calculate from, so this page does not show a figure. The department contact details and requirements are on the jurisdiction page.
What is different in Jackson
The permit covers single-issue work by bonded, licensed electrical contractors; larger projects include their electrical scope in the general building application instead. Applications route through intake review at the Warren Hood Building, and payment comes only after all reviews complete — by credit card or ACH online, or by cash or check at the division. Inspections are requested and monitored through the same portal, and the permit prints with job cards that must be posted on site.
What this figure does not include
Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.
Not included in these figures
No fee estimate is offered because none is published. A final Jackson electrical permit may include the permit fee itself and any reinspection charges in the adopted schedule; Entergy's metering and connection charges, state licensing costs and any building-permit fee for a larger project sit outside this trade permit entirely.
What you need before applying
- Bonded, licensed contractorRequired
Permits are issued only to master technicians who are bonded contractors; any contractor performing construction work in Jackson must have a bond on file with the office as required by ordinance, and advertising as licensed without the proper City of Jackson Mechanical Board license is unlawful.
Common questions
How much does an electrical permit cost in Jackson, MS?
The City doesn't publish the amount. The adopted schedule of fees that Sec. 26-2 defers to isn't posted online, and the OpenGov application form shows fees only after sign-in. The Building Permit Division quotes the fee during review; call (601) 960-1160 for the amount. Third-party sites quoting Jackson electrical fees cite no official source.
Jackson Code of Ordinances Sec. 26-2; OpenGov portal
What work needs a stand-alone electrical permit in Jackson?
Electrical projects not associated with a Commercial or Residential Building Permit: meter change-outs, adding outlets and fixtures, panel repairs, temporary electric poles and similar single-issue jobs. If the work is part of a larger project, the general contractor or project lead includes it in the building application rather than filing separately.
City of Jackson Building Permitting portal
How do I apply for a Jackson electrical permit?
Through the City's OpenGov portal under Building Permitting. Applications must be complete or they're rejected, and permits are issued only to master technicians who are bonded contractors with a bond on file in the office.
City of Jackson Building Permitting portal
When is the electrical permit fee paid in Jackson?
After review. The portal notifies you when the permit is ready to pay; payment is online by credit card or ACH, or by cash or check at the division. The permit issues automatically once payment completes.
City of Jackson Building Permitting portal
Do I need plans for a Jackson electrical permit?
Applications must be accompanied by two complete sets of drawings unless the work is minor enough not to require plan review or is part of a permitted building project. For typical single-issue electrical work — a meter swap, a panel repair — the minor-work exception applies.
City of Jackson Building Permitting portal
Can a homeowner pull an electrical permit in Jackson?
The portal's conditions state permits are issued only to master technicians who are bonded contractors, and contractors must hold the proper City of Jackson Mechanical Board license. Homeowners planning their own electrical work should contact the Building Permit Division at (601) 960-1160 to confirm how the rule applies to them.
City of Jackson Building Permitting portal
How are electrical inspections handled in Jackson?
Through the OpenGov portal: you request and monitor inspections online as needed, and the permit prints with a job card that must be posted on site in a protective sleeve somewhere easily visible.
City of Jackson Building Permitting portal
What is a temporary electric pole permit in Jackson?
The portal lists temporary power among the examples a stand-alone electrical permit covers — service for construction sites before permanent power is connected. The fee comes from the same unpublished adopted schedule; the division quotes it at (601) 960-1160.
City of Jackson Building Permitting portal
Source and verification
The documents behind every figure on this page, with the dates that make them checkable.
- Permit portalCityPrimary source
City of Jackson Building Permitting portal (OpenGov)
The application channel. Lists Residential Building, Commercial Building, Demolition/Moving, Electrical, Fence, Gas, Mechanical, Plumbing, POD, generator and related permit types with their scope descriptions (quoted on the pages). Every 'Apply Online' action routes to the Viewpoint Cloud sign-in, so fees are visible only after authentication; the payment step happens after review ('you will receive notification to pay your permit fee').
- Municipal codeCityPrimary source
Jackson Code of Ordinances, Ch. 26 (Buildings and Building Regulations), Sec. 26-2 — Permit, fee
Sec. 26-2: 'The permit fee for work requiring a permit shall be established by the adopted schedule of fees. The adopted schedule of fees shall govern.' (Ord. No. 2019-30(9), eff. 2019-03-05.) The code defers to the adopted schedule without reproducing it, and no appendix of the Municode consolidation publishes one.
Verification
Last verified against the official source in Sep 2026.