Gulfport, MS

Gulfport Plumbing Permit Cost

Gulfport plumbing permits are priced by Building Code Services from the department's plumbing fee schedule.

Every permit pays the $30.00 base fee, then the fixture list: $5.00 per standard fixture (water closets, sinks, tubs, showers, disposals, dishwashers, washing machines and more), $7.00 for lavatories and floor drains, $10.00 for water heaters and heating appliances, $50.00 for a water connection — the list's largest row — and $15.00 for a backflow preventer. Sprinkler heads price at $10.00 for the first five and $2.00 each after. The schedule carries an FY 2002 column heading, which the page states plainly.

Official fee scheduleVerified Sep 2026City of Gulfport — Urban Development Department, Building Code Services

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for a plumbing permit
ComponentFormulaApplies whenRange
Backflow preventer ($15.00 each)Permit fee$15.00 per backflow devicebackflow devices at least 1—
Fixtures ($5.00 each)Permit fee$5.00 per fixtureFixtures at least 1—
Floor drains ($7.00 each; $10.00 with trap primer)Permit fee$7.00 per floor drainfloor drains at least 1—
Gas service line ($10.00 each)Permit fee$10.00 per gas service linegas service lines at least 1—
Radiant heaters, floor furnaces, hot-air furnaces, radiators and circulating heaters ($10.00 each)Permit fee$10.00 per heating applianceheating appliances at least 1—
Lavatories ($7.00 each)Permit fee$7.00 per lavatorylavatories at least 1—
Other connections ($25.00 each)Permit fee$25.00 per other connectionother connections at least 1—
Piping ($5.00 each)Permit fee$5.00 per piping runpiping runs at least 1—
Floor drains with trap primer ($10.00 each)Permit fee$10.00 per floor drainprimed floor drains at least 1—
Sprinkler heads ($10.00 for 1-5, $2.00 each additional)Permit fee$10.00 for the first 5 sprinkler heads, plus $2.00 for each additional sprinkler headsprinkler heads at least 1—
Water connection ($50.00 each)Permit fee$50.00 per water service connectionwater service connections at least 1—
Water heaters ($10.00 each)Permit fee$10.00 per water heaterwater heaters at least 1—
Base permit fee ($30.00)Permit fee$30.00 flat feeEvery permit of this type—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A Gulfport bathroom remodel: three standard fixtures (water closet, tub/shower, disposal), one lavatory, one floor drain, a water-heater replacement, and a new water connection.

Inputs used for this example
InputValue
Project valuation$10,000
Fixtures3
Occupancy classResidential
Type of workAlteration
Number of lavatories1
Number of floor drains1
Number of water heaters1
Number of water service connections1

Example total

$119.00

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 6Rules considered 13

Fee components
ComponentHow it is calculatedAmount
Fixtures ($5.00 each)Permit feePlumbingPermitFeeSchedule2002: Fixtures, Water Closet, Sink, Bath Tub, Grease Trap, Urinal, Laundry Tub, Sewer Connection, Shower, Water Fountain, Dishwasher, Disposal, Washing Machine, Swimming Pool, Kitchen Range, Hot Plate and Boilers, $5.00 each. One count covers the $5.00 items on the job.
Show the working
Number of fixtures
3
Rate per unit
$5.00
Component total
$15.00
$5.00 per fixture$15.00
Floor drains ($7.00 each; $10.00 with trap primer)Permit feePlumbingPermitFeeSchedule2002: Floor Drain, $7.00; Floor Drain with trap primer, $10.00. Count primed drains separately in the trap-primed row — the unprimed ones price at $7.00 here.
Show the working
Number of floor drains
1
Rate per unit
$7.00
Component total
$7.00
$7.00 per floor drain$7.00
Lavatories ($7.00 each)Permit feePlumbingPermitFeeSchedule2002: Lavatories, $7.00 each.
Show the working
Number of lavatories
1
Rate per unit
$7.00
Component total
$7.00
$7.00 per lavatory$7.00
Water connection ($50.00 each)Permit feePlumbingPermitFeeSchedule2002: Water Connection, $50.00.
Show the working
Number of water service connections
1
Rate per unit
$50.00
Component total
$50.00
$50.00 per water service connection$50.00
Water heaters ($10.00 each)Permit feePlumbingPermitFeeSchedule2002: Water Heater/full auto and Water Heater/Instant, $10.00 each.
Show the working
Number of water heaters
1
Rate per unit
$10.00
Component total
$10.00
$10.00 per water heater$10.00
Base permit fee ($30.00)Permit feeEach schedule states a base permit fee of $30.00 for issuing each permit, charged before the schedule's own rows.
Show the working
Flat fee
$30.00
$30.00 flat fee$30.00
Total $119.00

Fees that do not apply here

Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.

  • Backflow preventer ($15.00 each) — This fee does not apply to the inputs provided.
  • Gas service line ($10.00 each) — This fee does not apply to the inputs provided.
  • Radiant heaters, floor furnaces, hot-air furnaces, radiators and circulating heaters ($10.00 each) — This fee does not apply to the inputs provided.
  • Other connections ($25.00 each) — This fee does not apply to the inputs provided.
  • Piping ($5.00 each) — This fee does not apply to the inputs provided.
  • Floor drains with trap primer ($10.00 each) — This fee does not apply to the inputs provided.
  • Sprinkler heads ($10.00 for 1-5, $2.00 each additional) — This fee does not apply to the inputs provided.

Assumptions

  • Calculated from 6 fee rules in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

Base fee: $30.00. Standard fixtures: 3 × $5.00 = $15.00. Lavatory: $7.00. Floor drain: $7.00. Water heater: $10.00. Water connection: $50.00. Total: $119.00.

What is different in Gulfport

Plumbing permits cover fixture installations and replacements, water and sewer connections, water heaters, gas service lines ($10.00), sprinkler systems and backflow prevention. Permits go to bonded master plumbers, and inspections are performed by Building Code Services; work covered before inspection must be uncovered. On the Mississippi Gulf Coast, backflow prevention and proper drain priming matter — the schedule prices trap-primed floor drains at $10.00 against $7.00 unprimed.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

This estimate covers the City of Gulfport plumbing permit fees only. It excludes:

  • Water and sewer tap and connection charges billed by Gulfport's water utility — the $50.00 schedule row is the permit fee for the connection work, not the utility's tap charge.
  • Building, electrical and mechanical permits for the same project.
  • Gas company meter and service charges (the $10.00 row prices the gas line permit itself).
  • Harrison County septic permits for property outside the sewer service area.
  • State plumbing licensing fees.

What you need before applying

  • Licensed, bonded plumbing contractorRequired

    Plumbing permits are issued to bonded master plumbers; advertising as a licensed contractor without the proper City license is unlawful under the ordinance the department administers.

Common questions

How is a Gulfport plumbing permit fee calculated?

The $30.00 base fee plus a per-item charge from the fixture list: $5.00 for each standard fixture or appliance, $7.00 for lavatories and floor drains, $10.00 for water heaters and heating appliances, and specific amounts for connections and devices. A bathroom remodel with a toilet, tub, disposal, lavatory and water heater runs $30.00 + $15.00 + $7.00 + $10.00 = $62.00.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

What counts as a $5.00 fixture in Gulfport?

The schedule's five-dollar rows: fixtures generally, water closets, sinks, bath tubs, grease traps, urinals, laundry tubs, sewer connections, showers, water fountains, dishwashers, disposals, washing machines, swimming pools, kitchen ranges, hot plates and boilers.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

How much is a water heater permit in Gulfport?

$10.00 — the schedule prices both 'Water Heater/full auto' and 'Water Heater/Instant' at that amount — plus the $30.00 base fee, so a water heater alone is a $40.00 permit.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

Why is the water connection row $50.00?

The water connection is the schedule's largest plumbing row — five times a standard fixture — because it covers tying a building into the city's water system. It prices the permit for the connection work; the water utility's own tap and meter charges are billed separately.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

How are sprinkler heads priced on a Gulfport plumbing permit?

$10.00 covers sprinkler heads one through five, and each additional head is $2.00 — so a ten-head system is $10.00 + 5 × $2.00 = $20.00, on top of the $30.00 base fee.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

What does a floor drain cost to permit in Gulfport?

$7.00, or $10.00 with a trap primer. The schedule prices the primed version $3.00 higher because the primer device is additional equipment the inspector verifies.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

How much is a gas line permit in Gulfport?

$10.00 per gas service line, plus the $30.00 base fee. The same plumbing sheet carries the row — Gulfport permits gas piping through Building Code Services rather than through a separate gas board.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

Is the Gulfport plumbing fee schedule current?

The document's column is headed 'FY 2002 Permit Fee' and the department links it as its plumbing fee schedule today. This page charges the printed amounts and states the vintage rather than adjusting them.

Gulfport Plumbing Permit Fee Schedule (FY 2002)

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Fee schedule (PDF)CityPrimary source

    City of Gulfport — Plumbing Permit Fee Schedule, FY 2002 (PlumbingPermitFeeSchedule2002.pdf)

    City of Gulfport Urban Development — Building Code Services · Document dated October 1, 2002 · Effective October 1, 2002 · Retrieved September 26, 2026

    Column headed 'Type of Permit FY 2002 Permit Fee': $30.00 base fee plus a fixture price list — $5.00 generic fixtures, $7.00 lavatories and floor drains ($10.00 with trap primer), $10.00 water heaters and heating appliances, $50.00 water connection, $25.00 other connections, $15.00 backflow preventer, sprinkler heads $10.00 for 1–5 + $2.00 each additional. Layout garbles a few row/column pairs in extraction; each pair was re-checked against the PDF structure before transcription.

  • City websiteCityPrimary source

    Urban Development — Building Code Services department page

    City of Gulfport · Undated document · Retrieved September 26, 2026

    Department page linking the three fee-schedule PDFs and the trade permit applications; names the department, address, phone and contact. Note: mygulfport.us is Gulfport, Florida — all Gulfport MS material lives on gulfport-ms.gov.

Verification

Last verified against the official source in Sep 2026.