Detroit prices construction permits three different ways inside one 51-page fee schedule.
The building permit is a nine-band ladder on the project's own cost — $271.43 flat at $2,000 or less, then each band's printed Base plus a rate per $1,000 "or fraction thereof" over the threshold. The electrical permit is a $66 Part A base fee plus $20 a circuit, $1.17 or $1.46 a fixture, and one of eight service bands chosen by amperage and voltage class. The plumbing permit is a $73 non-refundable application fee plus $44 per listed item and $146 per building drain or sewer. Plan review is charged as a percentage on top and is named on every page, never summed into a total.
Each page shows the fee components, the formula the jurisdiction uses, and a worked example you can follow by hand.
Estimate your potential Detroit permit fee with our Building Permit Fee Calculator.
| Permit | Category | Last reviewed |
|---|---|---|
| Detroit building permit cost | structural | 2026-09-25 |
| Detroit electrical permit cost | electrical | 2026-09-25 |
| Detroit plumbing permit cost | plumbing | 2026-09-25 |
Local context
One department, one portal, a very long document. The Buildings, Safety Engineering, and Environmental Department (BSEED) issues building permits, demolition permits and every trade permit from the Coleman A. Young Municipal Center, 2 Woodward Ave, Suite 408 (general customer service (313) 224-3202; application help (313) 224-3179). Applications run through Accela at permits.detroitmi.gov, with plans uploaded to ProjectDox — the City's "ePLANS" workflow — across a seven-step process. The City publishes its turnaround times: 5 days for residential building permits, 20 for commercial, and 1, 2 and 1 days for the mechanical, electrical and plumbing trade permits.
The fee schedule is one 51-page PDF, and extraction is the hard part. Its header reads "EFFECTIVE, JANUARY 1, 2024" and "Modified 7/18/2025", and every figure on this site comes from that document read in `pdftotext -table` mode — the first two modes mis-pair labels with amounts in this file, pushing the fee column away from the rows it belongs to. The Building Permit Fees page links it as the current download, which is how it was told from the older schedules still sitting on the domain: a 2009 general fee schedule still prints a 30% refund deduction where the current document says 35%.
Plan review is charged three ways and none of the three is in a total here. "A fee is charged for Electrical, Mechanical and Plumbing plan review. This fee must be prepaid when a plan review is required" — each trade is 7% "of Bldg. Permit Fee". Building, structural and zoning review is a deposit of 35% of the building permit fee, and two sentences later the same paragraph calls it "The deposit of 30% Building Permit fee is adjustable towards the full fee when a final building permit is procured". Revised plans are $158 for the first three sheets and $53 each after, per discipline. A cross-permit percentage whose base a stand-alone trade permit does not have, a deposit stated two ways, and a sheet count this site does not collect: named with their amounts, charged as none of them.
Valuation
Project cost, in the schedule's own words. "The following general building permit fees are based on the project cost (design and construction cost) estimated using the square foot cost table copy attached" — so the basis is money the reader declares, and the band is chosen by it. That square-foot cost table is named as attached and appears in no page of the PDF, nor linked from any City page read on 2026-09-25: the basis is unambiguous, the City's own estimator is unpublished, and this site says so rather than reproducing a table it has not seen.
Every rate row rounds up. "Per $1,000 or fraction thereof over $N" prints on all eight rate rows, so the cost above a band's threshold is rounded up to a whole $1,000 before the rate applies: $2,000.01 pays the $271.43 base plus one full $34.09 step — $305.52 — not 34 cents of a step. The first band is the floor stated as a row ("$2,000 or less — Flat — $271.43"), so a $500 repair permit is $271.43 with no minimum applied to any other row.
The bands do not chain, so they are not chained here. Each band's printed Base is close to what the band below produces at its top, minus a seam: $271.43 + 23 × $34.09 = $1,055.50 against the printed $1,055.57 (7¢), widening to $26.67 at $50,000,000. Every band is modelled with its own printed Base and its own printed rate.
Demolition is a different basis entirely — cubic volume, not money: $143 without a basement and $249 with one up to 30,000 cubic feet, then the Detroit Demolition Wrecking Fee's ladder and $8,858 with explosives. The ladder refuses work_type = demolition for that reason rather than pricing a wrecking job from a construction valuation.
The office that issues the permit, with the details we have verified. Confirm current hours before travelling.
The list is not a disclaimer: on a new house the fees left out can outweigh the permit fee several times over. Every entry here is stated on the permit page as well.
Not included in our estimates
These figures are Detroit's building, electrical and plumbing permit fees from the schedule in force. They are not a total project cost, and they exclude:
The documents these figures are transcribed from. Where a source contradicts itself we keep both readings and say so on the permit page.
BSEED Fee Schedule, effective January 1, 2024, modified July 18, 2025 (51 pages)
Read 2026-09-25 in three pdftotext modes: -layout pushes the fee-amount column into its own stream of numbers with no row to belong to, plain mode separates every label from every amount, and -table pairs them correctly — every figure this site charges is the -table pairing. Parts A–C (licences, certificates, service fees), the building/residential block with the nine-band ladder and the REFUNDS deduction, F: PLAN REVIEW, then the ELECTRICAL, PLUMBING and mechanical trade sections, then property maintenance and the administrative tail. The document page (S2) links this file as the current download; a 2009 "GENERAL FEE SCHEDULE" still on the domain was read only to confirm it is not the linked document — its refund sentence still says 30% where the current one says 35%.
Building Permit Fees — City of Detroit
Read 2026-09-25 (HTTP 200). The document page that links the fee schedule as "Download the latest list of fees for permits", which is how the schedule in force was told from the older schedules still on the domain. Publishes no amount of its own.
Building Permits — City of Detroit
Read 2026-09-25 (HTTP 200). The seven-step process, the Accela/ProjectDox submission rules, the licence rule per permit type (residential contractors need a Builder's License and City registration; the page states "No license required" for commercial building permits), sealed plans, and the published turnaround times: 5 days residential, 20 days commercial. Also where the City points readers at the Water & Sewerage Department and the Department of Public Works for the permits BSEED does not issue.
Buildings, Safety Engineering, and Environmental Department — City of Detroit
Read 2026-09-25 (HTTP 200). The department's own description of what it issues ("Apply for a Building Permit / Apply for a Electrical, Plumbing or Mechanical Permit"), the division map, and the links to the permit portal (https://permits.detroitmi.gov) and the fee schedule this site charges from.
Construction Inspection — BSEED
Read 2026-09-25 (HTTP 200). The six trade teams with their supervisors and phone numbers, the Certificate of Occupancy / Certificate of Acceptance procedure (72-hour turnaround), inspection scheduling, and the fire-alarm permitting update quoted on this site's electrical page: "No separate building permit is required solely for fire alarm systems when a Fire Marshal permit has been issued … Trade permits (electrical, mechanical, etc.) are still required for applicable installation work."
Construction — City of Detroit
Read 2026-09-25 (HTTP 200). Submittal requirements in the City's own words — sealed drawings by a Michigan-registered architect or engineer, three sets plus calculations and specifications, site plan, geotechnical report — the codes in force, the trade division phone numbers, and the ten facts about certificates of occupancy. No amount on this site comes from this page.
Read 2026-09-25 (HTTP 200). What plan review is here — "verification of compliance to City of Detroit Zoning Ordinance, Michigan Building Code, Michigan Residential Code, Michigan Rehabilitation Code, Michigan Electrical Code, Michigan Mechanical Code, Michigan Plumbing Code, International Fuel Gas Code, City Elevator Code and Boiler Code" — plus the ePLANS workflow, the plan checklists and the Pre-Plan Consultation. Defines the scope of the percentage charges this site names but does not sum.
Trade Permits — City of Detroit
Read 2026-09-25 (HTTP 200). The permit-type matrix for mechanical, electrical, plumbing, elevator, fire alarm, generators and boilers: when a trade permit is needed, the licence each one requires ("City of Detroit licensed Electrician/Plumbing Contractor/Mechanical Contractor"), what an owner must bring to file (deed plus photo ID), and the published turnarounds — 1 day mechanical, 2 days electrical, 1 day plumbing.