An electrical permit in Portland, Maine reads the same cost-of-work formula as the building permit:
$30.00 for the first $1,000 plus $10.00 per additional $1,000 of the electrical scope's cost. A $6,000 service upgrade and panel job prices $80.00.
How this fee is calculated
These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.
| Component | Formula | Applies when | Range |
|---|---|---|---|
| Electrical permit, cost of work to $1,000 ($30.00)Permit fee | $30.00 flat fee | Project valuation up to $1,000 | — |
| Electrical permit ($30.00 for the first $1,000 + $10.00 per additional $1,000)Permit fee | $30.00 + $10.00 per $1,000 of project valuation above $1,000, or fraction thereof | Project valuation over $1,000 | — |
A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.
A worked example
Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.
Worked example
A 200-amp service upgrade with a new sub-panel in Portland, Maine, cost of electrical work $6,000.
| Input | Value |
|---|---|
| Project valuation | $6,000 |
| Occupancy class | Residential |
Example total
$80.00
An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.
Fee schedule as of 2026-09-28Rules applied 1Rules considered 2
| Component | How it is calculated | Amount |
|---|---|---|
Electrical permit ($30.00 for the first $1,000 + $10.00 per additional $1,000)Permit feeCity of Portland, Maine permit documents: '$10 PER $1,000 + $30 FOR THE FIRST $1,000' of cost of work — the same formula in clean type on the City's sign-permit application ('$30 for the first $1,000 of cost of work; $10 per $1,000'). Partial thousands round up.Show the working
| $30.00 + $10.00 per $1,000 of project valuation above $1,000, or fraction thereof, in $1,000 steps | $80.00 |
| Total | $80.00 |
Fees that do not apply here
Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.
- Electrical permit, cost of work to $1,000 ($30.00) — This fee does not apply to the inputs provided.
Assumptions
- Calculated from 1 fee rule in effect on 2026-09-28.
- Amounts are rounded to the nearest cent, once, at the end of each component.
Cost of work $6,000: $30.00 for the first $1,000 plus $10.00 for each of the 5 additional thousands: $30.00 + 5 x $10.00 = $80.00.
A $1,000 job would price the first-thousand fee alone: $30.00.
What is different in Portland
The Code Enforcement division issues electrical permits alongside the building permit, and the cost-of-work formula prices them the same way. Declare the cost of the electrical work: $30.00 covers the first $1,000, and each additional thousand (or part) adds $10.00 — $3,000 of work prices $50.00, $10,000 prices $120.00.
The City's electrical forms also carry flat device rows for specific installations (services, circuits by type), which price small jobs below the formula's first-thousand base; the formula is the general permit charge. As with the building page, partial thousands round up.
Maine's electrical inspections run through the same division; there is no separate state fee collected with the municipal permit.
What this figure does not include
Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.
Not included in these figures
This is the City's cost-of-work electrical permit charge. It excludes:
- The building permit for the project the electrical work belongs to.
- Flat device rows on the City's electrical forms for specific installations.
- Utility charges (Central Maine Power service and meter work).
- State charges — none are added to the municipal permit.
Common questions
How much is an electrical permit in Portland, Maine?
$30.00 for the first $1,000 of electrical cost of work plus $10.00 per additional $1,000 — $80.00 at $6,000 of work.
Is there a minimum electrical permit fee?
The formula's first-$1,000 fee of $30.00 is the floor; smaller jobs price $30.00.
Do I need a separate electrical permit for a panel upgrade?
Yes — the electrical permit is its own application priced from its own scope's cost.
Who inspects the work?
The City's Code Enforcement / Inspections Division.
Does the state add a fee?
No — Maine does not add a surcharge to municipal electrical permits.
How is the cost of work determined?
By the declared cost of the electrical scope — labour and materials — read against the same formula the building permit uses.
What about solar installations?
They are electrical permits priced from the scope's cost of work on the same formula.
How does a $10,000 job price?
$30.00 + 9 x $10.00 = $120.00.
Is plan review charged?
The City's forms print no separate plan-review percentage.
How do I apply?
Through the Code Enforcement division or the City's online portal.
Source and verification
The documents behind every figure on this page, with the dates that make them checkable.
- City websiteCityPrimary source
City of Portland, Maine — Building or Use Permit (permit-fee formula as printed)
The City's own permit form prints the fee formula: '$10 PER $1,000 + $30 FOR THE FIRST $1,000' of cost of work. The same formula in clean type on the City's 2013 sign-permit application ('$30 for the first $1,000 of cost of work; $10 per $1,000' above) confirms the reading. The City's website migrated platforms in 2025-2026 and legacy DocumentCenter fee pages 404 at read time; the permit documents in the archive carry the formula the City charges.
Verification
Last verified against the official source in Sep 2026.