South Bend, IN

South Bend building permit cost

A South Bend building permit is priced two ways, and the schedule says which applies.

New construction and additions are "Cost per Square Foot (CSF) times the Total Square Footage (TSF) times the Local Variable Factor (LVF) of .00098" — that is, 0.00098 of the building's construction valuation, with the ICC Building Valuation Table supplying the cost per square foot and a published $60.00 minimum. Remodeling, alterations and repairs over $500, fences, in-ground pools, communication towers and utilities run down a 100-row ladder that starts at $60.00 and adds $5.00 per $1,000 band to $545.00 at $100,000, then prints its own bases of $550.00, $0.90 per $1,000 up to $1,000,000 and $0.60 per $1,000 above it.

Official fee scheduleVerified Sep 2026City of South Bend

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for a building permit
ComponentFormulaApplies whenRange
Building permit — remodeling, alterations and repairs: $60.00 plus $5.00 per $1,000 up to $100,000Permit fee$60.00 + $5.00 per $1,000 of project valuation above $3,000, or fraction thereofbuilding scope is alteration and Project valuation up to $100,000—
Building permit — remodeling, alterations and repairs: $550.00 plus $0.90 per $1,000 from $100,000 to $1,000,000Permit fee$550.00 + $0.90 per $1,000 of project valuation above $100,000, or fraction thereofbuilding scope is alteration and Project valuation over $100,000 and Project valuation up to $1,000,000—
Building permit — remodeling, alterations and repairs above $1,000,000: $1,360.00 plus $0.60 per $1,000Permit fee$1,360.00 + $0.60 per $1,000 of project valuation above $1,000,000, or fraction thereofbuilding scope is alteration and Project valuation over $1,000,000—
Building permit — new construction and additions: cost per square foot × total square footage × .00098 ($60.00 minimum)Permit fee0.098% of project valuationbuilding scope is new constructionmin $60.00
Northeast Neighborhood Development Area design review — $160.00, in addition to any other permitOther fee$160.00 flat feenortheast overlay is provided—
Building reinspection — $60.00 each, commercial and industrial projectsInspection fee$60.00 per inspectionreinspection requested is provided—
Building additional final inspection — $80.00 each, where a previous final inspection failedInspection fee$80.00 per additional final inspectionextra final inspection is provided—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A $150,000 commercial alteration — a valuation inside the alteration ladder's closed portion, and the ordinary mid-size job the table is built for.

Inputs used for this example
InputValue
Project valuation$150,000
Building scopealteration

Example total

$595.00

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 1Rules considered 7

Fee components
ComponentHow it is calculatedAmount
Building permit — remodeling, alterations and repairs: $550.00 plus $0.90 per $1,000 from $100,000 to $1,000,000Permit feeTwo of the sheet's printed rows, in full: "100,000 and up ... $550.00*" and "* PLUS per thousand dollars ($1000.00) of estimated construction cost thereafter, up to $1,000,000.00 total estimated construction cost ... $0.90". The $550.00 sits $5.00 *above* the $545.00 the closed table reaches at $100,000 — the opposite of the step-down seam Minneapolis and Saint Paul both print — and it is charged as printed, because the sheet states it as its own base.
Show the working
Project valuation
$150,000
Amount above the first $100,000
$50,000
At $0.90 per $1,000
$45.00
Base charge
$550.00
Component total
$595.00
$550.00 + $0.90 per $1,000 of project valuation above $100,000, or fraction thereof, in $1,000 steps$595.00
Total $595.00

Fees that do not apply here

Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.

  • Building permit — remodeling, alterations and repairs: $60.00 plus $5.00 per $1,000 up to $100,000 — This fee does not apply to the inputs provided.
  • Building permit — remodeling, alterations and repairs above $1,000,000: $1,360.00 plus $0.60 per $1,000 — This fee does not apply to the inputs provided.
  • Building permit — new construction and additions: cost per square foot × total square footage × .00098 ($60.00 minimum) — This fee does not apply to the inputs provided.
  • Northeast Neighborhood Development Area design review — $160.00, in addition to any other permit — This fee does not apply to the inputs provided.
  • Building reinspection — $60.00 each, commercial and industrial projects — This fee does not apply to the inputs provided.
  • Building additional final inspection — $80.00 each, where a previous final inspection failed — This fee does not apply to the inputs provided.

Assumptions

  • Calculated from 1 fee rule in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

The ladder: $60.00 for the first $3,000, then $5.00 for each $1,000 band above it. $150,000 is band 147 from that floor, so the fee is $60.00 + 147 × $5.00 = $795.00 — one of the hundred printed rows' own arithmetic, and the row the table prints for $149,001 to $150,000.

Two seams are worth seeing from here. At $100,000 exactly the ladder pays $545.00; one dollar more pays $550.90, because the printed "100,000 and up" base of $550.00 sits $5.00 above where the closed table stops and the $0.90 rate then applies to the $1 that crossed the seam. And at $1,000,000 the second band reaches $1,360.00, after which the sheet's own $0.60 per $1,000 takes over for a $1,000,001 job.

The new-construction side of the same page is a different calculation entirely: a $150,000 *new building* — valued at $150,000 through the ICC table — pays $147.00, because .00098 of the valuation is the whole fee. Nothing in the calculator picks between the two: the scope does, and the schedule's own heading is what defines it.

What is different in South Bend

The alteration ladder is the most regular thing in the document and it reproduces completely: one hundred printed rows, $60.00 at the bottom and $5.00 for every $1,000 band, every one of them exactly what $60.00 plus $5.00 per $1,000 above $3,000 gives — $95.00 at $10,000, $545.00 at $100,000. Then the sheet prints "100,000 and up ... $550.00", which is $5.00 above the row beneath it, and adds two open rates: "$0.90 per thousand dollars ($1000.00) of estimated construction cost thereafter, up to $1,000,000.00 total estimated construction cost" and "$0.60 per one thousand dollars ... thereafter". A $500,000 job is $550.00 plus 400 × $0.90, $910.00 — a rate that is less than a fifth of the ladder's own $5.00 per $1,000, which is how front-loaded these tables are.

New construction is the opposite: one formula, no rows. `CSF × TSF × .00098` reads as a rate on area but is not one — `CSF × TSF` is the construction valuation the International Code Council's table produces for the occupancy, and .00098 is what turns that valuation into a fee. A $200,000 building pays $196.00, and anything under about $61,000 of valuation pays the published $60.00 minimum.

The sheet's own warning sits above all of it: "WHERE A PERSON SHALL UNLAWFULLY PROCEED TO DO ANY WORK OR CONSTRUCTION WITHOUT A REQUIRED PERMIT, THE PERMIT FEES SHALL BE TRIPLED AS A PENALTY." That is a penalty and not a fee row, so the calculator states it here rather than multiplying it into a rule.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

This is the building permit fee the 2026 schedule charges. It excludes:

  • The Fire Department commercial plan review table — headed "CITY PROJECTS ONLY" ($348.00 sprinkled, $205.00 non-sprinkled, $253.00 addition, and a remodel ladder to $253.00 above $58,000): it prices the City's own projects, not a permit a reader buys.
  • The Northeast Neighborhood Development Area design review — $160.00 for stand-alone residential or commercial new construction in that overlay district. It is modelled and it is `other`, charged in addition to the permit and only when the plan is in the district; a job anywhere else in the city does not pay it.
  • The two inspection rows — a commercial or industrial reinspection at $60.00 and an additional final inspection after a failure at $80.00. They are trips charged when they happen, not rows of a permit's arithmetic.
  • The heating, ventilating and air-conditioning schedule — pages 11 and 12 of the same document, a fourth trade with its own minimum.
  • The moving, wrecking, sign and tent rows — separate permits with their own bases (a move $125.00 to $175.00, wrecking $0.02 or $0.015 a square foot with a $60.00 minimum).
  • The triple-fee penalty — stated above as the sheet states it, and never multiplied into a calculation.

What you need before applying

  • The construction valuation comes from the ICC table, not from the applicant's estimateRequired

    The schedule does not let an applicant name a number: "Cost per Square Foot (CSF) shall be determined by the International Code Council Building Valuation Table in effect in January of each year", and paragraph (c) amends three occupancy groupings onto that table ("Groups F-1, F-2, H-1, H-2, H-3, H-4, and M shall have the same rate As A-3", "Groups I-4, R-2, and R-4 shall have the same rate as I-1", "Groups S-1, S-2, and U shall have the same rate as R-3"). The alteration table below it reads a different figure — "Estimated Construction Costs" — which the sheet leaves to the application. The calculator reads whichever basis the scope selects; it does not derive either.

  • Work without a permit is charged at triple the feeRequired

    The schedule's own warning, in full: "WHERE A PERSON SHALL UNLAWFULLY PROCEED TO DO ANY WORK OR CONSTRUCTION WITHOUT A REQUIRED PERMIT, THE PERMIT FEES SHALL BE TRIPLED AS A PENALTY. THE PAYMENT OF SUCH PENALTY SHALL NOT RELEASE THE PERSON IN DEFAULT FROM ANY OTHER PENALTIES HEREAFTER PROVIDED." A penalty is not a fee row, so the calculator charges the schedule and the penalty is stated here rather than multiplied into a rule: no reader should discover a triple charge by typing a value into a fee field.

  • The department's jurisdiction is the city, the unincorporated county and five townsRequired

    The schedule's second page states it: the department covers the City of South Bend and "the unincorporated areas of St. Joseph County (including Wyatt, Granger, Terre Coupe, and Crumstown)", plus the towns of Indian Village, Lakeville, North Liberty, Osceola and Roseland, which "have turned their inspection requirements over to our Department" while still issuing their own improvement location permits — and it names Mishawaka, New Carlisle and Walkerton as having their own departments. The department's own means of telling them apart is the address: five digits is the unincorporated county, three or four digits with a South Bend mailing is the city. The calculator prices the department's permit; which department issues it follows from the address.

Common questions

How much is a building permit in South Bend?

It depends which mechanism applies. New construction and additions pay .00098 of the building's construction valuation — `CSF × TSF × .00098`, with the ICC Building Valuation Table supplying the cost per square foot — under a $60.00 minimum, so a $200,000 building is $196.00. Remodeling, alterations and repairs over $500, fences, in-ground pools, communication towers and utilities pay $60.00 for the first $3,000 of estimated construction cost plus $5.00 for every $1,000 band above it, to $545.00 at $100,000, then $550.00 plus $0.90 per $1,000 to $1,000,000 and $0.60 per $1,000 above that.

What is the local variable factor and what does it multiply?

The schedule writes the new-construction fee as "Cost per Square Foot (CSF) times the Total Square Footage (TSF) times the Local Variable Factor (LVF) of $.00098". CSF times TSF is the building's construction valuation — the ICC table supplies the cost per square foot for the occupancy — so the factor multiplies a valuation, not an area. That is why the calculator charges 0.00098 of the valuation rather than 0.00098 of the square footage.

Why does the fee go up at $100,000 rather than down?

Because the sheet prints it that way. The closed ladder reaches $545.00 at $100,000, and the block above it opens with "100,000 and up ... $550.00*" — $5.00 higher — before applying $0.90 per $1,000 to the excess. Most schedules step down at a seam like this one (Minneapolis's $25,000 and Saint Paul's $100,000 do); this one steps up, and the calculator charges each printed base as printed rather than smoothing either direction.

Does the fee include the plan review?

There is no separate plan review fee in the building section. The schedule's building section is two fee mechanisms and two inspection rows, and the only plan review it publishes is the Fire Department's commercial table, which it heads "CITY PROJECTS ONLY" and which therefore prices the City's own projects rather than a reader's permit.

What happens if I build without a permit?

The schedule states it in capitals: "WHERE A PERSON SHALL UNLAWFULLY PROCEED TO DO ANY WORK OR CONSTRUCTION WITHOUT A REQUIRED PERMIT, THE PERMIT FEES SHALL BE TRIPLED AS A PENALTY. THE PAYMENT OF SUCH PENALTY SHALL NOT RELEASE THE PERSON IN DEFAULT FROM ANY OTHER PENALTIES HEREAFTER PROVIDED." The calculator states that rule rather than applying it, so no fee field can silently triple a charge.

Which areas does the South Bend Building Department serve?

The City of South Bend and the unincorporated areas of St. Joseph County, including Wyatt, Granger, Terre Coupe and Crumstown — plus Indian Village, Lakeville, North Liberty, Osceola and Roseland, which have handed the department their building, electrical, plumbing and HVAC inspections while keeping their own improvement location permits. Mishawaka, New Carlisle and Walkerton have their own departments. The department tells them apart by address: five digits is the unincorporated county, three or four digits with a South Bend mailing is the city.

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Fee schedule (PDF)CityPrimary source

    St. Joseph County / City of South Bend Building Department Permit Fee Schedule 2026

    St. Joseph County / City of South Bend Building Department · Document dated January 1, 2026 · Effective January 1, 2026 · Retrieved September 26, 2026

    Seventeen pages, read 2026-09-26 in two modes. The title page: "ST. JOSEPH COUNTY / CITY OF SOUTH BEND BUILDING DEPARTMENT PERMIT FEE SCHEDULE 2026". The jurisdiction page names the city, the unincorporated county and the five towns served. Page 3 opens the building section with the new-construction formula ("Cost per Square Foot (CSF) times the Total Square Footage (TSF) times the Local Variable Factor (LVF) of $.00098", with the ICC Building Valuation Table as CSF and "d Minimum Fee - $60.00") and begins the 100-row alteration ladder; pages 4 to 6 finish the ladder and print "100,000 and up ... $550.00*" with the two open rates ($0.90 per $1,000 to $1,000,000, then $0.60 per $1,000) and the two inspection rows; page 8 is the Northeast Neighborhood Development Area design review block; page 9 is electrical; page 10 is plumbing; pages 11 and 12 are heating and air conditioning; pages 13 to 15 are the miscellaneous, licensing and registration rows; and page 17 is the residential application checklist. The plumbing page is the reason two modes were used: `pdftotext -layout` shifts its amount column by one row from "Backflow Protection" onward (reading the lawn sprinkler row as $60.00 and the building-water rows as $7.00 and $10.00), while both `-raw` and `-simple` agree on the pairing the sheet prints ($6.00 for the sprinkler row, $12.00 and $25.00 for building water). Both readings are recorded in the research file and the disagreements are named on the page.

Verification

Last verified against the official source in Sep 2026.