Savannah, GA

Savannah Plumbing Permit Cost

A standalone Savannah plumbing permit is priced by Revenue Ordinance Art.

P §4 at $8.00 per $1,000 of total work cost, and any fraction thereof, with a $40.00 minimum and the $5.00 technology fee — the identical shape to the electrical section, and like it, free of charge when the plumbing is already inside a building permit's scope.

Official fee scheduleVerified Sep 2026City of Savannah — Development Services Department

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for a plumbing permit
ComponentFormulaApplies whenRange
Plumbing permit fee ($8.00 per $1,000, any fraction thereof)Permit fee$8.00 per $1,000 of project valuation, or fraction thereofEvery permit of this type—
Technology fee ($5.00 per permit)Technology fee$5.00 flat feeEvery permit of this type—
Minimum plumbing permit fee ($40.00)Permit feethe shortfall up to the $40.00 minimum on calculated permit feepermit fee under 4000—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A plumbing contractor pulls a standalone permit for a whole-house repipe and three-fixture rough-in with a work cost of $3,200.

Inputs used for this example
InputValue
Project valuation$3,200

Example total

$45.00

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 3Rules considered 3

Fee components
ComponentHow it is calculatedAmount
Plumbing permit fee ($8.00 per $1,000, any fraction thereof)Permit feeRevenue Ordinance Art. P §4: for work not covered by a building permit, $8.00 per $1,000, and any fraction thereof, of total work cost. Standalone trade permits only — no plumbing fee is charged for work inside a building permit's scope.
Show the working
Project valuation
$3,200
Rounded up to the next $1,000 or fraction thereof
$4,000
At $8.00 per $1,000
$32.00
Component total
$32.00
$8.00 per $1,000 of project valuation, or fraction thereof, in $1,000 steps$32.00
Technology fee ($5.00 per permit)Technology feeRevenue Ordinance Art. P §19: a $5.00 technology fee is added to all standalone trade permits.
Show the working
Flat fee
$5.00
$5.00 flat fee$5.00
Minimum plumbing permit fee ($40.00)Permit feeRevenue Ordinance Art. P §4: 'The minimum fee is $40.00.'
Show the working
Calculated permit fee
$32.00
Minimum fee
$40.00
Shortfall charged
$8.00
$40.00 minimum on calculated permit fee, less the $32.00 calculated$8.00
Total $45.00

Assumptions

  • Calculated from 3 fee rules in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

The rate is $8.00 per $1,000 "and any fraction thereof", so $3,200 rounds up to four whole steps: $8.00 × 4 = $32.00, below the $40.00 minimum. The permit-minimum shortfall raises the fee to $40.00. The technology fee adds $5.00. Total: $40.00 + $5.00 = $45.00.

What is different in Savannah

Plumbing permits cover water heater replacements, fixture rough-ins, repiping, sewer laterals and backflow devices, filed by Georgia-licensed Class I plumbing contractors with the Development Services Department. Inspectors verify pressure tests, venting and backflow protection before concealment; failed re-inspections are $50 for the first trip and $100 after. Savannah's flat $8/$1,000 trade rate makes small jobs inexpensive — most residential service work lands at the $40 minimum.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

City water and sewer connection charges and capacity fees, grease-trap review for food service, private well and septic approvals in unsewered areas, and after-hours inspection fees ($50/hour, three-hour minimum).

What you need before applying

  • Georgia Class I Plumbing Contractor LicenseRequired

    Standalone plumbing permits are issued to contractors holding a Georgia Class I plumbing contractor license registered with the City.

Common questions

What is the fee for a standalone plumbing permit in Savannah?

$8.00 per $1,000 of total work cost, and any fraction thereof, with a $40.00 minimum fee, plus the $5.00 technology fee per permit.

Savannah Revenue Ordinance, Art. P §4

Do I need a separate plumbing permit if I have a building permit?

No. Article P §4 charges plumbing fees only for work not covered by a building permit; fixtures roughed in under the building permit pay no additional plumbing fee.

Savannah Revenue Ordinance, Art. P §4

Why did my small job pay the minimum instead of the rate?

Because $8.00 per $1,000 of a job under $5,000 computes to less than $40.00 — a $3,200 job is $32.00 by rate — the ordinance's minimum fee of $40.00 applies instead. The minimum is a floor on the permit fee.

Savannah Revenue Ordinance, Art. P §4

What are the re-inspection fees in Savannah?

$50.00 for the first re-inspection and $100.00 for the second and each subsequent one when work fails inspection, is not ready, or the corrections were not made as scheduled.

Savannah Revenue Ordinance, Art. P §8

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • OrdinanceCityPrimary source

    City of Savannah Revenue Ordinance, Article P — Inspection Fees

    Savannah Mayor and Aldermen · Document dated January 1, 2022 · Effective January 1, 2022 · Retrieved September 26, 2026

    Article P §1: $8 per $1,000 of Cost of Construction to $5M, $4 per $1,000 to $10M, $2 per $1,000 above; $40 minimum; cost of construction = floor area x $80/sq ft residential or $125/sq ft commercial. §1(B)(1) plan review bands $40–$2,000. §2 and §4: electrical and plumbing $8 per $1,000 and any fraction thereof, $40 minimum. §19: $5 technology fee per permit.

Verification

Last verified against the official source in Sep 2026.