A Miami-Dade County plumbing permit is priced from the Plumbing and Gas Fee Sheet the applicant files:
$0.143 per square foot for a new or altered one- or two-family house, $9.66 for each roughed-in outlet or fixture, $48.31 per sewer connection, $12.88 per water service meter, and $56.36 or $88.55 for a backflow assembly by size. The permit has a floor of $227.90 — the County's $147.00 minimum plus its $65.00 up-front fee plus 7.5% of both — and gas work is on the same form rather than a separate permit.
How this fee is calculated
These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.
| Component | Formula | Applies when | Range |
|---|---|---|---|
| Water service backflow assembly, 2 1/2" or largerPermit fee | $88.55 per backflow device | plumbing item is backflow assembly and backflow size is two and a half inch or larger | — |
| Water service backflow assembly, 2" or lessPermit fee | $56.36 per backflow device | plumbing item is backflow assembly and backflow size is not two and a half inch or larger | — |
| Settling tank, grease trap or interceptorPermit fee | $50.73 flat fee | plumbing item is grease trap or interceptor | — |
| Lift station, interior station pipingPermit fee | $386.42 flat fee | plumbing item is lift station | — |
| Mobile home connectionPermit fee | $96.62 flat fee | plumbing item is mobile home | — |
| Roughing-in, plugged outlet or fixturePermit fee | $9.66 per fixture | Fixtures over 0 | — |
| Sewage treatment plant, interior plant pipingPermit fee | $241.52 flat fee | plumbing item is sewage treatment plant | — |
| Sewer connectionPermit fee | $48.31 per connection | connections over 0 | — |
| New, addition, alteration or repair, one and two family dwellingPermit fee | $0.143 per sq ft | Occupancy is residential and Work type is one of new construction, addition, alteration, repair, remodel | — |
| Solar water heaterPermit fee | $144.91 flat fee | plumbing item is solar water heater | — |
| Temporary toilet, first onePermit fee | $147.00 flat fee | plumbing item is temporary toilet | — |
| Water service connection, for each meter on each lotPermit fee | $12.88 per meter | plumbing item is water service | — |
| Water treatment plant, interior plant pipingPermit fee | $338.11 flat fee | plumbing item is water treatment plant | — |
| Minimum fee for the trade permitPermit fee | the shortfall up to the $147.00 minimum on calculated permit fee | permit fee under 14700 | — |
| Non-refundable up-front permit support feeOther fee | $65.00 flat fee | Every permit of this type | — |
| Miami-Dade RER building permitting surcharge, 7.5%Surcharge | 7.5% of fees charged | Every permit of this type | — |
| Florida Building Construction Standards surcharge, 1%State surcharge | 1% of calculated permit fee | Every permit of this type | min $2.00 |
| Florida Building Code Administrators and Inspectors surcharge, 1.5%State surcharge | 1.5% of calculated permit fee | Every permit of this type | min $2.00 |
A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.
A worked example
Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.
Worked example
A new one-family house in unincorporated Miami-Dade County: 2,500 square feet of floor area with eighteen plumbing fixtures, one sewer connection to the public system and one water service meter — filed on the plumbing and gas fee sheet.
| Input | Value |
|---|---|
| Project area | 2,500 sq ft |
| Fixtures | 18 |
| Occupancy class | Residential |
| Type of work | New construction |
| Number of meters | 1 |
| Number of connections | 1 |
| Plumbing item | water_service |
Example total
$721.71
An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.
Fee schedule as of 2026-09-28Rules applied 8Rules considered 18
| Component | How it is calculated | Amount |
|---|---|---|
Roughing-in, plugged outlet or fixturePermit feeSection I.C.3 lists the fixtures it counts — "bathtubs, closets, doctors, dentists, hospital sterilizers, autoclaves, autopsy tables and other fixtures, appurtenances, drinking fountains, fixtures discharging into traps or safe waste pipes, floor drains, laundry tubs, lavatories, showers, sinks, urinals, and heaters" — at "For each roughing-in or plugged outlet 9.66" and "Each fixture 9.66". Fee sheet `P001` and `P032` price the same two rows at $9.66 per outlet and per fixture.Show the working
| $9.66 per fixture | $173.88 |
Sewer connectionPermit feeSection I.C.5: "SEWER (ALL GROUPS) — Each building storm sewer and each building sewer where connection is made to a septic tank, or a collector line or to an existing sewer or to a city sewer or soakage pit or to a building drain outside a building. 48.31". Fee sheet `P003` "Sewer connection to public system" and `P044` "Sewer connection to private system" are both $48.31 per sewer.Show the working
| $48.31 per connection | $48.31 |
New, addition, alteration or repair, one and two family dwellingPermit feeSection I.C.2: "RESIDENTIAL PLUMBING (Single Family Residence or Duplex) — New, Single Family Residence or Duplex, Addition, Alterations or repairs to Single Family Residence or Duplex per square foot 0.143", with the note that three existing fees "are being grouped into one fee adjusted by the CPI". The plumbing fee sheet prints the same row as `P051`/`P052` at "0.14x per Sq ft".Show the working
| $0.143 per sq ft | $357.50 |
Water service connection, for each meter on each lotPermit feeSection I.C.7: "Water service connection to a municipal or private water supply system (for each meter on each lot) 12.88"; fee sheet `P010` "Water service connection or repair — $12.88 per Meter".Show the working
| $12.88 per meter | $12.88 |
Non-refundable up-front permit support feeOther fee"A.8 UP-FRONT FEE FOR PERMIT SUPPORT FUNCTIONS PERFORMED BY CONSTRUCTION, PERMITTING, AND BUILDING CODE (CPBC) — A non-refundable up-front fee will be assessed for permit support functions, including acceptance of applications, distribution of plans, document storage, and technology support for applications accepted through CPBC for Unincorporated Municipal Service Area jurisdiction applications. 65.00" — with a second row at $70.00 for municipal applications, which is not this jurisdiction's. The schedule places it in Section I, so the County's 7.5% surcharge reaches it; the fee sheet's $227.90 minimum is the proof.Show the working
| $65.00 flat fee | $65.00 |
Miami-Dade RER building permitting surcharge, 7.5%Surcharge"A.15 RER SURCHARGE — A Building Permitting surcharge of seven and one half (7.5%) percent on all Building Permitting fees listed in Section I except for Enforcement fees listed in Sub-section K. This surcharge is to be used to fund incremental direct costs and reasonable indirect costs associated with the Building Permitting activity that are directly related to enforcing the Florida Building Code." It is the County's own charge, on top of the two the state imposes.Show the working
| 7.5% of fees charged | $49.32 |
Florida Building Construction Standards surcharge, 1%State surcharge"A.20 STATE MANDATED SURCHARGE — Building Construction Standards: \"…there is created a surcharge assessed at the rate of 1 percent of the permit fees associated with enforcement of the Florida Building Code … The minimum amount collected on any permit issued shall be $2…\" (§ 553.72, Florida Statutes.) Surcharge rates may be subject to change as set by State Statute."Show the working
| 1% of calculated permit fee | $5.93 |
Florida Building Code Administrators and Inspectors surcharge, 1.5%State surcharge"A.21 STATE MANDATED SURCHARGE — Building Code Administrators and Inspectors: \"(1) This part shall be funded through a surcharge … at the rate of 1.5 percent of all permit fees associated with enforcement of the Florida Building Code … The minimum amount collected on any permit issued shall be $2…\" (§ 468.631, Florida Statutes.)" Both state surcharges are collected by the County and remitted to the state quarterly, with 10% retained for building department training.Show the working
| 1.5% of calculated permit fee | $8.89 |
| Total | $721.71 |
Fees that do not apply here
Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.
- Water service backflow assembly, 2 1/2" or larger — This fee does not apply to the inputs provided.
- Water service backflow assembly, 2" or less — This fee does not apply to the inputs provided.
- Settling tank, grease trap or interceptor — This fee does not apply to the inputs provided.
- Lift station, interior station piping — This fee does not apply to the inputs provided.
- Mobile home connection — This fee does not apply to the inputs provided.
- Sewage treatment plant, interior plant piping — This fee does not apply to the inputs provided.
- Solar water heater — This fee does not apply to the inputs provided.
- Temporary toilet, first one — This fee does not apply to the inputs provided.
- Water treatment plant, interior plant piping — This fee does not apply to the inputs provided.
- Minimum fee for the trade permit — This fee does not apply to the inputs provided.
Assumptions
- Calculated from 8 fee rules in effect on 2026-09-28.
- Amounts are rounded to the nearest cent, once, at the end of each component.
Four rows, each on its own code and its own unit: `P051` prices the house at $0.143 per square foot, which is $357.50; `P001`/`P032` price eighteen roughed-in outlets and fixtures at $9.66 each, $173.88; `P003` prices one sewer connection at $48.31; and `P010` prices one water service meter at $12.88. The rows total $592.57, comfortably above the $147.00 floor, so no minimum adjustment applies. The $65.00 up-front fee brings the charged subtotal to $657.57 and the County's 7.5% surcharge on it is $49.32; the state's 1% and 1.5% are charged on the $592.57 permit fee, $5.93 and $8.89. Total: $721.71.
A permit that is one stand-alone job rather than a whole house shows the floor at work. Six fixtures with nothing else is $57.96 of rows, which the floor raises by $89.04 to $147.00; with the $65.00 up-front fee, $15.90 of RER surcharge and the state's $2.00 and $2.21, the total is $232.11 — the same figure a one-row electrical permit reaches, because both sheets state the same $227.90 minimum.
Two cautions belong with the numbers. The fixture count is what the schedule says it is — "fixtures discharging into traps or safe waste pipes, floor drains, laundry tubs, lavatories, showers, sinks, urinals, and heaters" among others — and the site charges $9.66 for each one reported rather than deciding which of a project's fittings count. And the gas rows are on this form but not in this total: a gas water heater set, an outlet or a flue pipe is charged on the same application and adds to it.
What is different in Miami-Dade County
A plumbing permit here is a sum of rows from one applicant-facing form, and gas is one of its categories. Category 01 is general plumbing: `P051` and `P052` price a new, altered or repaired one- or two-family house at "0.14x per Sq ft" — the implementing order prints the same rate as 0.143, which is the figure this site charges — `P001` prices a roughed-in or plugged outlet at $9.66 and `P032` a fixture at the same $9.66, `P003` and `P044` price a sewer connection to a public or a private system at $48.31, and `P010` prices a water service connection at $12.88 for each meter on each lot. Category 02 is gas: outlets and appliances at $9.66 residential and $16.10 commercial, meters at $6.45, repairs to gas pipes at $56.36 per repair, flue pipe at $9.66. Category 03 is a lawn sprinkler system at $27.06 per zone, and Category 05 is chemical toilets for special events, the first at $147.00 and each additional at $13.29.
The house is therefore priced twice over — once by its area and once by what is installed in it — and the two are separate lines on the same application rather than alternatives. A 2,500 square foot house with eighteen fixtures, one sewer connection and one water meter is $357.50 of area, $173.88 of fixture work, $48.31 of sewer and $12.88 of water service, and it is the sum and not the largest of them that the form adds up. That is a genuinely different shape from every other plumbing schedule on this site: Portland prices a new house by how many baths it has, Orange County by a flat fee plus a fixture count, and neither of them prices the area as well.
The floor behaves the way it does on the electrical page, and for the same stated reason. "Minimum fee for plumbing permits is $227.90" is $147.00 plus $65.00 plus 7.5% of both, so a permit of six fixtures at $57.96 has $89.04 added to reach $147.00, pays the $65.00 up-front fee, and contributes 7.5% of $212.00 — $15.90 — to the surcharge stack, landing at $232.11 after the state's two surcharges. A permit that already exceeds $147.00 of rows pays nothing for the floor.
The one row that is priced by length comes last on this page rather than first: `P028` building sewerline at $11.28 per 50 feet, with `P016` repairs to water piping at $2.59 per 50 feet and `P046` sanitary pipelines at $11.28 per 50 feet. This site does not collect a pipe length, so it names them instead of pricing them, which is also why the sewer *connection* is priced here and the sewer *line* is not.
What this figure does not include
Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.
Not included in these figures
This estimate is the plumbing and gas fee sheet rows given to it, the $227.90 permit floor when it applies, the $65.00 up-front fee and the three surcharges. It excludes:
- The rows priced by length: building sewerline and sanitary pipelines at $11.28 per 50 feet, repairs to water piping at $2.59 per 50 feet — a length this site does not collect.
- The gas fitting rows beyond the meter: residential and commercial gas outlets and appliances, gas pipe repairs, flue pipe, and the water heater and ice maker connection rows.
- The remaining categories of the same form: lawn sprinkler systems at $27.06 per zone and the chemical toilet rows for special events, plus the rule that a renewal is charged the original permit fee.
- The mechanical permit and the electrical permit on the same job, each filed on its own sheet, one of which this site prices.
- Other agencies' charges collected with the permit: Water and Sewer's connection and capacity charges, DERM's environmental fees, Fire Rescue's, and the impact fees.
- The additional inspection rows: `P060` at $92.48 per inspection, and the re-inspection figure shared across the trades.
- The double fee the sheet imposes for work done without a permit, and the refund restrictions on submittal, licence and recording fees.
What you need before applying
- Roughing-in and fixtures are charged as counts, and a gas job is on the same formRequired
The implementing order lists what the fixture count includes — "bathtubs, closets, doctors, dentists, hospital sterilizers, autoclaves, autopsy tables and other fixtures, appurtenances, drinking fountains, fixtures discharging into traps or safe waste pipes, floor drains, laundry tubs, lavatories, showers, sinks, urinals, and heaters" — at $9.66 each, and the fee sheet prices the same figure twice, as `P001` per outlet and `P032` per fixture. Gas is Category 02 of the same form: gas outlets and appliances at $9.66 residential and $16.10 commercial, meters at $6.45, repairs to gas pipes at $56.36 per repair. Because it is one form, a plumbing permit and a gas permit are the same application here.
- Working without a permit is charged doubleRequired
The fee sheet states it on the signature block, above the signature line: "Refunds will not be given in case of error on your part and you will be charged a double fee for doing work without a permit." The same warning is on the electrical sheet in the same position, and it is one of the few penalties in this dataset that a builder signs to acknowledge before the permit exists.
Common questions
Why is a new house charged by area and by fixture?
Because they are two different lines on the same form. `P051` prices new single family residence or duplex work at $0.143 per square foot of the master permit, and `P001`/`P032` price each roughed-in outlet and each fixture at $9.66. Both are claimed on the plumbing and gas fee sheet, and the form adds the lines rather than picking one, so a house with eighteen fixtures pays for its area and for its fixtures.
Plumbing and Gas Fee Sheet, form 123_01-708/26, Category 01
What is the minimum a plumbing permit can cost?
"Minimum fee for plumbing permits is $227.90", stated at the top of the sheet. That is the County's $147.00 minimum on the fee rows, its $65.00 up-front fee, and 7.5% of both — the same construction as the electrical sheet's floor, which reinforces that this is how the County computes it. With the state's 1% and 1.5% surcharges the least a plumbing permit costs is $232.11, and the floor is charged once per permit rather than once per row.
Plumbing and Gas Fee Sheet, form 123_01-708/26
Is the gas permit separate?
It is a separate category of the same form rather than a separate application: Category 02, "GAS FITTING (natural gas) (must be on separate application)" — so it is a distinct permit that is applied for on the plumbing and gas sheet, and `P019` and `P062` price appliances at $9.66 residential and $16.10 commercial. The fixture and area rows are Category 01 and are not part of it.
Plumbing and Gas Fee Sheet, Category 02
How much is a sewer connection or a water service?
`P003` sewer connection to the public system and `P044` to a private system are both $48.31 per connection, and the implementing order prices "each building storm sewer and each building sewer where connection is made to a septic tank, or a collector line or to an existing sewer" at the same figure. `P010` prices the water service connection at $12.88 "for each meter on each lot". The piping between those connections is priced by length — `P028` at $11.28 per 50 feet — and is not included here because this site does not collect a pipe length.
Plumbing and Gas Fee Sheet, Category 01
What does a backflow assembly cost?
`P033` prices a water service backflow assembly of 2 inches or less at $56.36 each and `P034` one of 2 1/2 inches or larger at $88.55, which the implementing order prints as the same two figures. Both are per assembly, so a building with four devices pays four of them, and the size is what decides which of the two rows applies.
Plumbing and Gas Fee Sheet, Category 01
Is there a re-inspection fee?
There is, and it is shared across the trades: the division charges $38.00 for a re-inspection and $38.00 for a meter reset, printed on the same section by the electrical and plumbing schedules rather than inside either of them. The plumbing sheet's own additional-inspection row is different and larger — `P060` at $92.48 per inspection — and the re-inspection figure for a commercial or residential job is also stated in the implementing order's electrical minimum note.
Implementing Order No. 4-63, Sections I.D and I.C
What happens if the work is done without a permit?
The sheet says so above the signature line: "Refunds will not be given in case of error on your part and you will be charged a double fee for doing work without a permit." The implementing order prices the same penalty in its own section, and the refund rules work the other way as well — nothing is returned on a submittal, licence or recording fee, and a permit refund carries its own charge.
Plumbing and Gas Fee Sheet, applicant declaration
Source and verification
The documents behind every figure on this page, with the dates that make them checkable.
- OrdinanceCountyPrimary source
Thirty pages, sha256 beginning 7f23cd971ade46be, re-fetched on 2026-09-24 to confirm the URL still serves the file this site was built from, and read in three pdftotext modes. It is an implementing order rather than an ordinance — "Ordered June 16, 2026, Effective June 26, 2026", superseding the order of June 26, 2025 — which is why a fee schedule in this county can be re-ordered inside a year, and why the County's own fee page still carries the notice for the preceding change: "Effective Oct. 1, 2025 the Building Division will be implementing a revised fee schedule adopted by the Board of County Commissioners on June 30, 2025. This is the first increase in more than 17 years." The URL is the one the County's fee page links.
- Fee schedule (PDF)CountyPrimary source
Plumbing and Gas Fee Sheet (form 123_01-708/26)
Sha256 beginning c4aec030fb2ff505, re-fetched on 2026-09-24. It carries the same floor in the same words — "Minimum fee for plumbing permits is $227.90" — and it is the source for the plumber's rows this site prices: `P051`/`P052` at "0.14x per Sq ft", `P001` at "$9.66 per Outlet", `P032` at "$9.66 per Fixture", `P003`/`P044` at "$48.31 per Sewer", `P010` at "$12.88 per Meter". Its second category is gas, which the County prices on this form rather than separately.
Verification
Last verified against the official source in Sep 2026.