An electrical permit in Bridgeport is issued by the Building Department against the same value-of-work table the building permit reads:

$60.00 from $501 to $1,000 of value, then $60.00 plus $30.00 per $1,000 or part of above the first thousand. The schedule's one electrical carve-out is a $40.00 flat row for a water heater replacement only.

Official fee scheduleVerified Sep 2026City of Bridgeport, Connecticut

How this fee is calculated

These are the components the schedule defines for this permit, as they applied on 2026-09-28. A component only applies to your project if its conditions match — read that column before assuming a figure. Want a figure for your own project? Estimate this fee with the permit fee calculator.

Fee components for an electrical permit
ComponentFormulaApplies whenRange
Electrical work, water heater only ($40.00)Permit fee$40.00 flat feewater heater only is true—
Electrical permit ($60.00 for the 1st $1,000 + $30.00 per $1,000 or part of)Permit fee$60.00 + $30.00 per $1,000 of project valuation above $1,000, or fraction thereofProject valuation over $1,000—

A real permit fee is these components added together. The department’s final calculation is the one that applies — this is the schedule it will be based on.

A worked example

Follow the arithmetic by hand. Every line is produced by the engine from the rules above, so the total cannot drift away from the schedule behind it.

Worked example

A water heater replacement in Bridgeport, permitted as electrical work only.

Inputs used for this example
InputValue
Occupancy classResidential
Water heater onlyYes

Example total

$40.00

An estimate, not an official fee. It is calculated from the published fee schedule as it applied on 2026-09-28. The permit office’s own calculation is the one that applies, and your project may fall under rules this schedule does not describe.

Fee schedule as of 2026-09-28Rules applied 1Rules considered 2

Fee components
ComponentHow it is calculatedAmount
Electrical work, water heater only ($40.00)Permit feePrinted schedule row: 'ELECTRICAL WORK, WATER HEATER ONLY: $40.00.' A discounted flat row for that single scope, read on the same Building Department schedule.
Show the working
Flat fee
$40.00
$40.00 flat fee$40.00
Total $40.00

Fees that do not apply here

Listed so you can see what was considered and left out, rather than wondering whether something is missing. A rule can also be left out because it is not published for this permit at all, and that is stated where it matters.

  • Electrical permit ($60.00 for the 1st $1,000 + $30.00 per $1,000 or part of) — This fee does not apply to the inputs provided.

Assumptions

  • Calculated from 1 fee rule in effect on 2026-09-28.
  • Amounts are rounded to the nearest cent, once, at the end of each component.

The schedule prints 'ELECTRICAL WORK, WATER HEATER ONLY: $40.00' — a flat $40.00 for that single scope, regardless of the water heater's cost.

For any other electrical scope the value table prices the permit: $60.00 at $1,000 of value, $180.00 at $5,000, $330.00 at $10,000.

What is different in Bridgeport

The schedule proves its own scope. On the same printed page as the building table sits the row 'ELECTRICAL WORK, WATER HEATER ONLY: $40.00' — which only makes sense if the Building Department prices electrical work from the same value-of-work table, with the water heater the one discounted scope. The local electrical trade's published walkthrough reads the table the same way: $40 for the smallest jobs, $60 at $1,000, $90 at $2,000.

For the calculator this means an electrical permit behaves exactly like the building permit it usually accompanies: declare the value of the electrical work, and the same $60-plus-$30-per-thousand arithmetic prices it. A $5,000 electrical scope is $60.00 + 4 x $30.00 = $180.00; a $1,000 scope is $60.00.

Two flat rows bracket the table. The $40.00 water-heater-only row is the schedule's own discount for that single, repeatable scope — the calculator charges it only when you mark the job as a water heater replacement. And sign licences ($150.00 new / $85.00 renewed) sit on the same sheet but are separate permits entirely.

What this figure does not include

Impact fees, utility connections and other departments’ permits are the usual omissions, and in some jurisdictions they are larger than the permit fee itself.

Not included in these figures

This is the Building Department's electrical permit pricing. It excludes:

  • The building permit for the project the electrical work belongs to, priced separately on the building page here.
  • The $125.00 certificate-of-occupancy fee, which attaches to building permits rather than trade permits.
  • Sign licences ($150.00 new, $85.00 renewal) on the same schedule.
  • Zoning permits and any Park City Portal processing fees.
  • A plan-review fee — the schedule publishes none.

Common questions

How much is an electrical permit in Bridgeport?

It follows the Building Department's value-of-work table: $60.00 at $1,000 of value, then $30.00 per $1,000 or part of above the first thousand — the same arithmetic as the building permit.

What does a water heater replacement permit cost?

$40.00 flat — the schedule's 'ELECTRICAL WORK, WATER HEATER ONLY' row, the one discounted scope on the sheet.

Who issues electrical permits in Bridgeport?

The Building Department, the same office that issues building permits — the schedule covering both sits on the City's Building Department pages.

How is the electrical fee calculated for a $5,000 job?

$60.00 for the first $1,000 plus $30.00 for each of the 4 additional thousands: $180.00. A $5,100 job rounds up to 5 blocks: $210.00.

Is there a minimum electrical permit fee?

The printed table's lowest row is $40.00 (the water-heater-only carve-out); the value table itself starts at $40.00 for value to $500 and $60.00 to $1,000. Those printed rows are the floor the schedule publishes.

When did these fees take effect?

The schedule is printed 'Effective 5/18/16' — May 18, 2016.

Do I need a separate electrical permit for a panel upgrade?

Yes — a service or panel upgrade is its own electrical permit priced from the value of that work, not a line item on the building permit.

Is the fee different for commercial electrical work?

No — the value-of-work table makes no residential or commercial distinction on the electrical side.

What about a sign licence?

Signs are their own rows: $150.00 for a new sign licence, $85.00 to renew — separate from any electrical permit.

How do I apply for an electrical permit?

Through the Park City Portal, the Building Department's online application route, with documents submitted in PDF form.

Source and verification

The documents behind every figure on this page, with the dates that make them checkable.

  • Fee schedule (PDF)CityPrimary source

    City of Bridgeport — "PERMIT FEES - BUILDING DEPARTMENT - Effective 5/18/16"

    City of Bridgeport Building Department · Document dated May 18, 2016 · Effective May 18, 2016 · Retrieved September 26, 2026

    Read 2026-09-26 from the City's own host (HTTP 200; text layer extracted with pdftotext). The schedule states the formula outright — '$60.00 for the 1st $1,000 in Value of Work, plus $30.00 per thousand or part of, after first thousand' — and prints the matching linear table from $40.00 (value to $500) to roughly $1.49M of value. Flat rows on the same sheet: ALL BUILDING PERMITS ADD $125 for C/O Fee, Certificate of Occupancy $125.00, Replacement Water Heater Only $40.00 (building and electrical), new sign licence $150.00, renewal $85.00. No plan-review percentage is printed anywhere on the schedule.

Verification

Last verified against the official source in Sep 2026.

Other permits in Bridgeport